KEY PROJECT INFORMATION

INVESTMENT
$90,600.00

PAYBACK
26 Months

M / SAVINGS
$3,403.33

SYSTEM SIZE
99.45kW

GENERATION
141.75MWh
YEARLY COST BEFORE SOLAR
YEARLY COST AFTER SOLAR
AC Laser
A leading manufacturer based in Thomastown, Victoria, turned to Cyanergy to meet their solar energy needs. To reduce their escalating energy costs and increase sustainability, AC Laser invested $90,600 in a 99.45 kW solar system that generates 141.75 MWh annually.
Challenges
AC Laser faced high annual energy expenses of $79,000.00, significantly affecting their operating costs and financial performance. There was an urgent need to control energy costs while moving toward greener, more sustainable energy solutions.
Solution
Cyanergy, known for its expertise and customer-driven approach in the commercial solar industry, custom-designed and installed a solar solution tailored to AC Laser’s energy consumption patterns. The system, which includes Fronius inverters and Longi panels, was selected for its efficiency and performance to meet the company’s specific energy demands.
Results
The results of the installation have been remarkable. AC Laser now saves an average of $3,403.33 per month, slashing their annual energy bill from $79,000 to $38,160. With a payback period of just 26 months, this investment delivers a fast return, along with substantial long-term savings and operational efficiency.
Why Cyanergy
Cyanergy’s reputation as the go-to provider for commercial solar installations stems from its exceptional track record, personalized service, and dedication to quality. Their ability to deliver high-performing solar solutions that address the specific needs of businesses like AC Laser guarantees optimal energy savings and enhanced efficiency. Cyanergy’s focus on innovation and sustainability made them the ideal partner for AC Laser’s transition to renewable energy.
Project Conclusion
The successful implementation of Cyanergy’s solar system for AC Laser demonstrates the significant advantages of commercial solar investment. By reducing energy costs and enhancing sustainability, AC Laser has set a new standard in energy management for the manufacturing sector.


Contact us today to learn more about how commercial solar can work for your business
Recent Projects

Kew Golf Club | 99kW Commercial Solar Installation
Kew Golf Club, one of Victoria’s premier golfing destinations, was looking for a cost-effective solar energy solution to reduce its rising electricity costs and lower its carbon footprint

Ashfield Bowling Club | Commercial Solar Installation
Ashfield Bowling Club has invested $9,670 in a 32.56 kW solar system, generating 41.395 MWh annually. This initiative saves $805.83 monthly, with a payback period of 12 months, showcasing the club's commitment to sustainability and energy efficiency for its members and the community.

Retail
Retail Initially, the retail store was not properly lighted. They were facing problems with safety and productivity. Plus the high power bill and high maintenance cost. These challenges made them

Tixana Pty Ltd
KEY PROJECT INFORMATION CASE STUDY Tixana Pty Ltd Campsie, NSW Download Case Study INVESTMENT $44,920.00 PAYBACK PERIOD 38 Months MONTHLY SAVINGS $907.50 SYSTEM SIZE 40.33 kW GENERATION 51MWh YEARLY COST

The Bean Cartel | Commercial Solar Installation
The Bean Cartel, a renowned coffee roasting company based in Notting Hill, Victoria, made a strategic investment in solar energy to enhance sustainability efforts and reduce operational costs. With the assistance of Cyanergy, The Bean Cartel successfully installed a solar array comprising 41 JASolar panels on the roof of their warehouse.

Healey Factory Project
KEY PROJECT INFORMATION CASE STUDY The Healey Factory Mitcham, VIC 3132 Download Case Study INVESTMENT $56,035.00 PAYBACK PERIOD 35 Months SYSTEM SIZE 59.4 kW GENERATION 77.621MWh YEARLY COST BEFORE SOLAR