KEY PROJECT INFORMATION
INVESTMENT
$90,600.00
PAYBACKÂ
26 Months
M / SAVINGS
$3,403.33
SYSTEM SIZE
99.45kW
GENERATION
141.75MWh
YEARLY COST BEFORE SOLAR
$79,000.00
YEARLY COST AFTER SOLAR
38,160.00
AC Laser
A leading manufacturer based in Thomastown, Victoria, turned to Cyanergy to meet their solar energy needs. To reduce their escalating energy costs and increase sustainability, AC Laser invested $90,600 in a 99.45 kW solar system that generates 141.75 MWh annually.
Challenges
AC Laser faced high annual energy expenses of $79,000.00, significantly affecting their operating costs and financial performance. There was an urgent need to control energy costs while moving toward greener, more sustainable energy solutions.
Solution
Cyanergy, known for its expertise and customer-driven approach in the commercial solar industry, custom-designed and installed a solar solution tailored to AC Laser’s energy consumption patterns. The system, which includes Fronius inverters and Longi panels, was selected for its efficiency and performance to meet the company’s specific energy demands.
Results
The results of the installation have been remarkable. AC Laser now saves an average of $3,403.33 per month, slashing their annual energy bill from $79,000 to $38,160. With a payback period of just 26 months, this investment delivers a fast return, along with substantial long-term savings and operational efficiency.
Why Cyanergy
Cyanergy’s reputation as the go-to provider for commercial solar installations stems from its exceptional track record, personalized service, and dedication to quality. Their ability to deliver high-performing solar solutions that address the specific needs of businesses like AC Laser guarantees optimal energy savings and enhanced efficiency. Cyanergy’s focus on innovation and sustainability made them the ideal partner for AC Laser’s transition to renewable energy.
Project Conclusion
The successful implementation of Cyanergy’s solar system for AC Laser demonstrates the significant advantages of commercial solar investment. By reducing energy costs and enhancing sustainability, AC Laser has set a new standard in energy management for the manufacturing sector.
Contact us today to learn more about how commercial solar can work for your business
Recent Projects
AC Laser | Commercial Solar Installation
A leading manufacturer based in Thomastown, Victoria, turned to Cyanergy to meet their solar energy needs. To reduce their escalating energy costs and increase sustainability, AC Laser invested $90,600 in a 99.45 kW solar system that generates 141.75 MWh annually.
Lilydale Service Group
KEY PROJECT INFORMATION CASE STUDY Lilydale Service Group Lilydale, VIC Download Case Study INVESTMENT $33,651.96 PAYBACK PERIOD 32 Months MONTHLY SAVINGS $887.50 SYSTEM SIZE 38.15kW GENERATION 53.973MWh YEARLY COST BEFORE
Wyndham Community Schools
KEY PROJECT INFORMATION CASE STUDY Wyndham Community Schools Werribee, VIC Download Case Study INVESTMENT $49,000.00 PAYBACK PERIOD 49 Months SYSTEM SIZE 54.25 kW GENERATION 69.9MWh Wyndham Community Schools The ChallengeMost
Tixana Pty Ltd
KEY PROJECT INFORMATION CASE STUDY Tixana Pty Ltd Campsie, NSW Download Case Study INVESTMENT $44,920.00 PAYBACK PERIOD 38 Months MONTHLY SAVINGS $907.50 SYSTEM SIZE 40.33 kW GENERATION 51MWh YEARLY COST
Ram Locksmith Project
KEY PROJECT INFORMATION CASE STUDY Ram Locksmith Dandenong, VIC Download Case Study INVESTMENT $31,820.00 PAYBACK PERIOD 39 Months MONTHLY SAVINGS $715.00 SYSTEM SIZE 40kW GENERATION 53.96MWh YEARLY COST BEFORE SOLAR
Multi-Site Age Care Facility Project
KEY PROJECT INFORMATION CASE STUDY Age-Care Facility Project Mitcham, VIC Download Case Study INVESTMENT $60,000.00 PAYBACK PERIOD 52.8 months MONTHLY SAVINGS $1,193.25 SYSTEM SIZE: 60 kW GENERATION 80.652 MWh Age