KEY PROJECT INFORMATION
INVESTMENT
$90,735.00
PAYBACK
36 Months
M / SAVINGS
$2,276
SYSTEM SIZE
118.32kW
GENERATION
134,781 MWh
YEARLY COST BEFORE SOLAR
YEARLY COST AFTER SOLAR
VetLand Mitcham
Vetland 24-Hour Animal Hospital is setting a remarkable example in sustainability by collaborating with Cyanergy to install a state-of-the-art solar energy system. Designed to meet the unique energy demands of 24/7 veterinary care, this advanced system powers round-the-clock services for furry friends while significantly reducing environmental impact.
With Cyanergy’s expertise, Vetland is now saving an impressive $27,316 annually on energy costs. These savings free up valuable resources, allowing the hospital to focus on delivering exceptional care to its patients. At the same time, the hospital has taken a giant step toward reducing its carbon footprint, reinforcing its commitment to a greener future.
The system, equipped with hybrid inverters, is future-ready for battery expansion and integrates seamlessly with a generator to ensure uninterrupted power during blackouts. This means Vetland can continue providing reliable care no matter the circumstances—proving that sustainability and operational excellence go hand in hand.
Through research and innovation, Cyanergy has developed a tailored solution that meets Vetland’s specific needs while paving the way for a more sustainable veterinary industry. Vetland’s partnership with Cyanergy demonstrates that investing in renewable energy is not only good for the environment but also a smart financial decision that benefits pets, people, and the planet.
For veterinary practices looking to reduce costs and embrace sustainability, Vetland’s success story with Cyanergy is an inspiring example of what’s possible.
Contact us today to learn more about how commercial solar can work for your business
Recent Projects
Multi-Site Age Care Facility Project
KEY PROJECT INFORMATION CASE STUDY Age-Care Facility Project Mitcham, VIC Download Case Study INVESTMENT $60,000.00 PAYBACK PERIOD 52.8 months MONTHLY SAVINGS $1,193.25 SYSTEM SIZE: 60 kW GENERATION 80.652 MWh Age
Uniplas Mouldings International | Commercial Solar Installation
Yearly energy cost before solar $647,005.00. Yearly energy cost after solar $456,097.00!
Residential Case-studies
Residential The owner partnered with us with a primary goal of reducing their power bill of more or less $850 a quarter and ever-recurring maintenance costs. Immediately, Cyanergy’s assessment offered
Commercial Joinery Company
KEY PROJECT INFORMATION CASE STUDY Commercial Joinery Company Dandenong, VIC Download Case Study INVESTMENT $75,000.00 PAYBACK PERIOD 6 Years MONTHLY SAVINGS $1017.67 SYSTEM SIZE: 99.82 kW GENERATION 127.75 MWh YEARLY
Retail
Retail Initially, the retail store was not properly lighted. They were facing problems with safety and productivity. Plus the high power bill and high maintenance cost. These challenges made them
Whites Glenola Hay Far | Commercial Solar Installation
Yearly energy cost before solar $8750.00. Yearly energy cost after solar $428.00