KEY PROJECT INFORMATION

CASE STUDY

Uniplas

Wetherill Park, NSW 2204

Investment

INVESTMENT

$591,823.71

Payback period

PAYBACK 

37 Months

M / SAVINGS

$15,909.00

System size

SYSTEM SIZE

490kW

Generation

GENERATION

752 MWh

YEARLY COST BEFORE SOLAR

$647,005.00

YEARLY COST AFTER SOLAR

$456,097.00

Uniplas Mouldings International

Over the past three years, Matthew of Cyanergy has collaborated closely with Uniplas on a range of energy-saving products. As part of their partnership, Matt diligently assessed their power costs annually and conducted comprehensive feasibility studies for their facility.
In light of the significant increase in energy expenses over the past two years, they identified a remarkable opportunity for a large-scale solar installation. What makes this opportunity even more enticing is the remarkable reduction in the payback period. Initially estimated at 6-7 years, the payback period has been dramatically shortened to just 3 years, thanks to the favourable trends in energy costs.
To further maximize the benefits, the installation has been strategically divided into multiple stages. This innovative approach has enabled Uniplas to access three distinct sets of subsidies, resulting in a substantial upfront cost reduction of over $190,000.00. Moreover, the efficiency and speed at which the project progressed are truly noteworthy. From the initial consultation to the completion of stage 1, which entailed installing 200kW of solar power, a mere four weeks had elapsed, to the final stage, where a combined total of 490kW was installed to complete the project. 
This impressive turnaround time showcases the commitment and expertise of Cyanergy’s team in swiftly implementing sustainable energy solutions. 
Matt’s collaboration with Uniplas exemplifies the power of Cyanergy and proactive engagement in driving tangible outcomes. Our shared focus on energy efficiency has not only brought financial advantages to Uniplas but also fostered a greener and more sustainable future.

Upgrade your commercial refrigerated display cabinet
to save between $800 - $900 per year in energy savings as part of the NSW energy saving scheme.

Contact us today to learn more about how commercial solar can work for your business

Recent Projects

All Glass Recycling | Commercial Solar Installation

Are you interested in how All Glass Recycling, a leading player in the recycling industry, achieved significant cost savings and environmental sustainability through solar energy? Read on to discover how Cyanergy’s solar panel solution transformed All Glass Recycling’s operations.

Read More »

Manufacturing

Manufacturing To remain strong in industry, we scrutinize costs across every process. Lighting can account for up to 80% of a manufacturing warehouse energy bill so it must be as

Read More »

The Bean Cartel | Commercial Solar Installation

The Bean Cartel, a renowned coffee roasting company based in Notting Hill, Victoria, made a strategic investment in solar energy to enhance sustainability efforts and reduce operational costs. With the assistance of Cyanergy, The Bean Cartel successfully installed a solar array comprising 41 JASolar panels on the roof of their warehouse.

Read More »

Animal Health

Animal Health When the Animal Emergency Center moved their office to East Melbourne, they realized that the lighting I the premises was not up to the standard. They called us

Read More »
School Case Study

School

School This LED upgrade for a primary school in McKinnon, Victoria is a well-thought decision. It was high time for the school to find a solution to their sky-high energy

Read More »
commercial solar project

Healey Factory Project

KEY PROJECT INFORMATION CASE STUDY The Healey Factory Mitcham, VIC 3132 Download Case Study INVESTMENT $56,035.00 PAYBACK PERIOD 35 Months SYSTEM SIZE 59.4 kW GENERATION 77.621MWh YEARLY COST BEFORE SOLAR

Read More »
Scroll to Top