KEY PROJECT INFORMATION
INVESTMENT
$92,868.00
PAYBACK
58 Months
M / SAVINGS
$693.50
SYSTEM SIZE
32.8kW
GENERATION
55.98 MWh
YEARLY COST BEFORE SOLAR
$8,750.00
YEARLY COST AFTER SOLAR
$428.00
Whites Glenola Pty LTD
White Glenola Pty Ltd engaged Cynergy to install a 32.9 kW solar system with Longi panels, AlphaESS Smile5 Inverters, and AlphaESS Batteries. Additionally, the scope involved upgrading 92 outdated metal halide and mercury vapor lights to energy-efficient LED Highbay Lights and installing 26 LED Floodlights.
.Project Implementation:
The project’s implementation was a carefully orchestrated process aimed at achieving maximum efficiency and benefits:
An extensive site assessment was conducted by Cynergy’s team of experts. This assessment analyzed the farm’s energy requirements, geographical location, and available resources. It served as the foundation for designing a bespoke solar solution that would cater to White Glenola Pty Ltd’s specific needs.
Following the site assessment, the installation of the 32.9 kW Longi solar panels began. These panels were strategically placed to capture the maximum amount of sunlight, optimizing energy production. They effectively converted sunlight into DC power, setting the stage for the subsequent energy transformation process. The AlphaESS Smile5 Inverters were seamlessly integrated into the solar system. The AlphaESS Batteries, with a capacity of 53.2 kWh, were connected to the system. These batteries were instrumental in storing surplus energy generated during the day, ensuring a constant power supply during periods of reduced sunlight or grid interruptions. This bolstered the farm’s energy independence and resilience.
Benefits Achieved:
Energy Savings: The installation of the solar system, along with the energy-efficient LED lighting, significantly reduced the farm’s reliance on grid electricity. This led to substantial cost savings on energy bills, a welcome financial benefit.
Energy Independence: The integration of AlphaESS Batteries ensured that the farm could store surplus energy. This not only reduced reliance on the grid but also provided a stable power supply even during overcast days or grid failures, enhancing energy self-sufficiency.
Environmental Impact: The shift towards solar energy and LED lighting contributed to a reduced carbon footprint. The farm’s adoption of cleaner and more efficient technologies was aligned with sustainable environmental practices.
Improved Operations: The upgraded lighting systems, consisting of LED Highbay Lights and Floodlights, had a transformative impact on farm operations. The improved visibility and security enhanced the overall efficiency of daily tasks and contributed to a safer work environment.
Contact us today to learn more about how commercial solar can work for your business
Recent Projects
Animal Health
Animal Health When the Animal Emergency Center moved their office to East Melbourne, they realized that the lighting I the premises was not up to the standard. They called us
Sixt Car Rental | Commercial Solar Installation
Sixt Car Rental reached out to Cyanergy to explore options for reducing energy costs and enhancing sustainability.
Tixana Pty Ltd
KEY PROJECT INFORMATION CASE STUDY Tixana Pty Ltd Campsie, NSW Download Case Study INVESTMENT $44,920.00 PAYBACK PERIOD 38 Months MONTHLY SAVINGS $907.50 SYSTEM SIZE 40.33 kW GENERATION 51MWh YEARLY COST
Lilydale Service Group
KEY PROJECT INFORMATION CASE STUDY Lilydale Service Group Lilydale, VIC Download Case Study INVESTMENT $33,651.96 PAYBACK PERIOD 32 Months MONTHLY SAVINGS $887.50 SYSTEM SIZE 38.15kW GENERATION 53.973MWh YEARLY COST BEFORE
Sparacino Farms | Commercial Solar Installation
Sparacino Farms reaching out to Cyanergy to explore options for reducing energy costs and enhancing sustainability. Cyanergy’s team conducted a thorough assessment of the farm’s energy needs and financial goals, offering a tailored solar solution that included a 99.76 kW system for the farm and a separate 27.7 kW system with battery storage for the residential property.
Greenwood Business Park
Greenwood Business Park Working on big projects is not new to Cyanergy. We have had a handful of significant and relatively complicated jobs that we have successfully completed. One of