KEY PROJECT INFORMATION
INVESTMENT
$60,000.00
PAYBACK PERIOD
52.8 months
MONTHLY SAVINGS
$1,193.25
SYSTEM SIZE:
60 kW
GENERATION
80.652 MWh
Age Care Facility Project
Our customer sought a sustainable, high-quality, and affordable renewable energy solution that would help reduce operating costs. The Chief Operating Officer, was concerned about the potential impact on residents and maintaining service levels during such a complex rollout. 24-hours business operations, and health and safety and patient care obligations.
Cyanergy tailored the solar power systems to the roof spaces and electrical layouts of the Aged Care facility. In total, this comprised 132 solar panels covering a total area of 400 m2. Limiting disruption to daily operations over the two-stage rollout was managed in a flexible and cooperative manner. Our project management team maintained a high level of collaboration, communications, and policies and procedures were also modified to accommodate needs.
The 60 kW solar solutions have helped the Aged Care meet their goals for energy savings and sustainability. In total the systems are generating, on average, 210 kWh per day.Â
Contact us today to learn more about how commercial solar can work for your business
Recent Projects
Animal Health
Animal Health When the Animal Emergency Center moved their office to East Melbourne, they realized that the lighting I the premises was not up to the standard. They called us
Commercial Joinery Company
KEY PROJECT INFORMATION CASE STUDY Commercial Joinery Company Dandenong, VIC Download Case Study INVESTMENT $75,000.00 PAYBACK PERIOD 6 Years MONTHLY SAVINGS $1017.67 SYSTEM SIZE: 99.82 kW GENERATION 127.75 MWh YEARLY
Specialized | Commercial Solar Installation
Specialized, a renowned name in the cycling industry, embarked on a strategic sustainability initiative by investing in solar energy at its manufacturing facility in Port Melbourne, Victoria. Partnering with Cyanergy, Specialized aimed to enhance its environmental stewardship while simultaneously reducing operational costs. The initiative involved the installation of a solar array on the facility’s roof, comprising cutting-edge solar panels
Uniplas Mouldings International | Commercial Solar Installation
Yearly energy cost before solar $647,005.00. Yearly energy cost after solar $456,097.00!
Shine Apartments | Commercial Solar Installation
KEY PROJECT INFORMATION CASE STUDY Shine Apartments Campsie, NSW 2204 Download Case Study INVESTMENT $38,294.00 PAYBACKÂ 37 Months M / SAVINGS $910.00 SYSTEM SIZE 39.6kW GENERATION 54.65MWh YEARLY COST BEFORE
Berwick Mitsubishi | Commercial Solar Installation
Mitsubishi Berwick, a distinguished automotive dealership dedicated to sustainability and environmental stewardship, embarked on a strategic initiative to align its green ethos by integrating renewable energy into its operations. Mitsubishi Berwick strategically partnered with Cyanergy, a premier commercial solar installation company.