Commercial solar systems

KEY PROJECT INFORMATION

CASE STUDY

New life Aquarium

Keysborough, VIC

Investment

INVESTMENT

$31,250.00

Payback period

PAYBACK PERIOD

38 Months

Monthly savings

MONTHLY SAVINGS

$743.33

System size

SYSTEM SIZE

40.5 kW

Generation

GENERATION

51MWh

YEARLY COST BEFORE SOLAR

$33,620.00
YEARLY COST BEFORE SOLAR 34%

YEARLY COST AFTER SOLAR

$24,700.00
YEARLY COST AFTER SOLAR 25%
commercial solar panel installation

Newlife Aquarium Pty LTD.

Newlife Aquarium Pty LTD is situated in Keysborough, VIC. Newlife Aquarium is a high-quality aquarium and aquarium supplier that relies heavily on the main power grid. As the nature of their business requires a large amount of energy to be used, installing solar was the most cost-saving method and would assist the business with freeing up cashflow.

A main challenge the team needed to overcome was working with livestock on the property, this can be especially challenging when they essentially need a steady supply of oxygen to the water tanks. With careful planning, our team of expert installers set a record time, precisely 10 minutes to connect the inverters to the solar panels.

We installed a 40.05kW system on the property comprising 89 EGing solar panels, each providing 450 watts of production value. The solar panels were paired up with 2 Sungrow inverters, one of the best inverters available in the solar market. After installation, Newlife Aquarium saves approximately $743.33 a month.

The Newlife Aquarium team were extremely pleased with the project management and communication the cyanergy team provided. We succeeded in installing the system without much interruption to the business, and there was always plenty of oxygen supply for our aquatic friends.

Commercial solar systems

Contact us today to learn more about how commercial solar can work for your business

Recent Projects

All Glass Recycling | Commercial Solar Installation

Are you interested in how All Glass Recycling, a leading player in the recycling industry, achieved significant cost savings and environmental sustainability through solar energy? Read on to discover how Cyanergy’s solar panel solution transformed All Glass Recycling’s operations.

Read More »

Specialized | Commercial Solar Installation

Specialized, a renowned name in the cycling industry, embarked on a strategic sustainability initiative by investing in solar energy at its manufacturing facility in Port Melbourne, Victoria. Partnering with Cyanergy, Specialized aimed to enhance its environmental stewardship while simultaneously reducing operational costs. The initiative involved the installation of a solar array on the facility’s roof, comprising cutting-edge solar panels

Read More »
School Case Study

School

School This LED upgrade for a primary school in McKinnon, Victoria is a well-thought decision. It was high time for the school to find a solution to their sky-high energy

Read More »
Aged Care Facility

Multi-Site Age Care Facility Project

KEY PROJECT INFORMATION CASE STUDY Age-Care Facility Project Mitcham, VIC Download Case Study INVESTMENT $60,000.00 PAYBACK PERIOD 52.8 months MONTHLY SAVINGS $1,193.25 SYSTEM SIZE: 60 kW GENERATION 80.652 MWh Age

Read More »