KEY PROJECT INFORMATION
INVESTMENT
$75,000.00
PAYBACK PERIOD
6 Years
MONTHLY SAVINGS
$1017.67
SYSTEM SIZE:
99.82 kW
GENERATION
127.75 MWh
YEARLY COST BEFORE SOLAR
$29,755.92
YEARLY COST AFTER SOLAR
$14,700.20
Commercial Joinery Company
Commercial Joinery Company was established in 2006 and is a specialist industry leader delivering joinery services to commercial clients.
With power bills around 30k per year, Commercial Joinery Company asked Cyanergy to propose a suitable commercial solar solution.
Installing a commercial solar system for your business is a straightforward decision. As with all business investment decisions, it is all about the Return On Investment (ROI). When proposing a commercial solar system for a business, Cyanergy examines the current power usage patterns and designs a system that suits their requirements.
Using an advanced satellite-based solar mapping software, Cyanergy maps the solar panels onto the roof. The software takes into account the location, panel model, panel tilt and orientation to produce a report that gives the estimated output of the system allowing us to calculate estimated yearly savings and payback time.
OUTCOME SUMMARY
- Reduction in cost of energy by almost half
- Business is protected against future electricity rate increases
- Increased value of the property
- Reduced carbon emissions
- Improved business cash flow
Contact us today to learn more about how commercial solar can work for your business
Recent Projects
Commercial Joinery Company
KEY PROJECT INFORMATION CASE STUDY Commercial Joinery Company Dandenong, VIC Download Case Study INVESTMENT $75,000.00 PAYBACK PERIOD 6 Years MONTHLY SAVINGS $1017.67 SYSTEM SIZE: 99.82 kW GENERATION 127.75 MWh YEARLY
Philter Brewing | Commercial Solar Installation
KEY PROJECT INFORMATION CASE STUDY Philter Brewing Pty LTD Marrickville NSW 2204 Download Case Study INVESTMENT $82,227.75 PAYBACK 34 Months M / SAVINGS $2,427.00 SYSTEM SIZE 86kW GENERATION 119.99MWh YEARLY
New life Aquarium
KEY PROJECT INFORMATION CASE STUDY New life Aquarium Keysborough, VIC Download Case Study INVESTMENT $31,250.00 PAYBACK PERIOD 38 Months MONTHLY SAVINGS $743.33 SYSTEM SIZE 40.5 kW GENERATION 51MWh YEARLY COST
Greenwood Business Park
Greenwood Business Park Working on big projects is not new to Cyanergy. We have had a handful of significant and relatively complicated jobs that we have successfully completed. One of
Ram Locksmith Project
KEY PROJECT INFORMATION CASE STUDY Ram Locksmith Dandenong, VIC Download Case Study INVESTMENT $31,820.00 PAYBACK PERIOD 39 Months MONTHLY SAVINGS $715.00 SYSTEM SIZE 40kW GENERATION 53.96MWh YEARLY COST BEFORE SOLAR
Specialized | Commercial Solar Installation
Specialized, a renowned name in the cycling industry, embarked on a strategic sustainability initiative by investing in solar energy at its manufacturing facility in Port Melbourne, Victoria. Partnering with Cyanergy, Specialized aimed to enhance its environmental stewardship while simultaneously reducing operational costs. The initiative involved the installation of a solar array on the facility’s roof, comprising cutting-edge solar panels