KEY PROJECT INFORMATION

CASE STUDY

Commercial Joinery Company

Dandenong, VIC

Investment

INVESTMENT

$75,000.00

Payback period

PAYBACK PERIOD

6 Years

Monthly savings

MONTHLY SAVINGS

$1017.67

System size

SYSTEM SIZE:

99.82 kW

Generation

GENERATION

127.75 MWh

YEARLY COST BEFORE SOLAR

$29,755.92

YEARLY COST AFTER SOLAR

$14,700.20

Commercial Joinery Company

Commercial Joinery Company was established in 2006 and is a specialist industry leader delivering joinery services to commercial clients.

With power bills around 30k per year, Commercial Joinery Company asked Cyanergy to propose a suitable commercial solar solution.

Installing a commercial solar system for your business is a straightforward decision. As with all business investment decisions, it is all about the Return On Investment (ROI). When proposing a commercial solar system for a business, Cyanergy examines the current power usage patterns and designs a system that suits their requirements.

Using an advanced satellite-based solar mapping software, Cyanergy maps the solar panels onto the roof. The software takes into account the location, panel model, panel tilt and orientation to produce a report that gives the estimated output of the system allowing us to calculate estimated yearly savings and payback time.

OUTCOME SUMMARY

  • Reduction in cost of energy by almost half
  • Business is protected against future electricity rate increases
  • Increased value of the property
  • Reduced carbon emissions
  • Improved business cash flow
installation by a CEC approved installer

Contact us today to learn more about how commercial solar can work for your business

Recent Projects

Animal Health

Animal Health When the Animal Emergency Center moved their office to East Melbourne, they realized that the lighting I the premises was not up to the standard. They called us

Read More »

Berwick Mitsubishi | Commercial Solar Installation

Are you interested in how All Glass Recycling, a leading player in the recycling industry, achieved significant cost savings and environmental sustainability through solar energy? Read on to discover how Cyanergy’s solar panel solution transformed All Glass Recycling’s operations.

Read More »

Commercial Joinery Company

KEY PROJECT INFORMATION CASE STUDY Commercial Joinery Company Dandenong, VIC Download Case Study INVESTMENT $75,000.00 PAYBACK PERIOD 6 Years MONTHLY SAVINGS $1017.67 SYSTEM SIZE: 99.82 kW GENERATION 127.75 MWh YEARLY

Read More »

Restaurant

Restaurant As we lead our way through LED technology, we slowly influenced different types of industries including the restaurants, Thus, we slowly transform how businesses see and think the importance

Read More »
Commercial solar systems

New life Aquarium

KEY PROJECT INFORMATION CASE STUDY New life Aquarium Keysborough, VIC Download Case Study INVESTMENT $31,250.00 PAYBACK PERIOD 38 Months MONTHLY SAVINGS $743.33 SYSTEM SIZE 40.5 kW GENERATION 51MWh YEARLY COST

Read More »

Fuel Stations

Fuel Stations Bright and clear canopy lighting increases a sense of safety and the comfort that can make the difference between “let’s drive on to the next one” to “let’s

Read More »
Scroll to Top