KEY PROJECT INFORMATION

CASE STUDY

Commercial Joinery Company

Dandenong, VIC

Investment

INVESTMENT

$75,000.00

Payback period

PAYBACK PERIOD

6 Years

Monthly savings

MONTHLY SAVINGS

$1017.67

System size

SYSTEM SIZE:

99.82 kW

Generation

GENERATION

127.75 MWh

YEARLY COST BEFORE SOLAR

$29,755.92

YEARLY COST AFTER SOLAR

$14,700.20

Commercial Joinery Company

Commercial Joinery Company was established in 2006 and is a specialist industry leader delivering joinery services to commercial clients.

With power bills around 30k per year, Commercial Joinery Company asked Cyanergy to propose a suitable commercial solar solution.

Installing a commercial solar system for your business is a straightforward decision. As with all business investment decisions, it is all about the Return On Investment (ROI). When proposing a commercial solar system for a business, Cyanergy examines the current power usage patterns and designs a system that suits their requirements.

Using an advanced satellite-based solar mapping software, Cyanergy maps the solar panels onto the roof. The software takes into account the location, panel model, panel tilt and orientation to produce a report that gives the estimated output of the system allowing us to calculate estimated yearly savings and payback time.

OUTCOME SUMMARY

  • Reduction in cost of energy by almost half
  • Business is protected against future electricity rate increases
  • Increased value of the property
  • Reduced carbon emissions
  • Improved business cash flow
installation by a CEC approved installer

Contact us today to learn more about how commercial solar can work for your business

Recent Projects

Ram Locksmith Project

KEY PROJECT INFORMATION CASE STUDY Ram Locksmith Dandenong, VIC Download Case Study INVESTMENT $31,820.00 PAYBACK PERIOD 39 Months MONTHLY SAVINGS $715.00 SYSTEM SIZE 40kW GENERATION 53.96MWh YEARLY COST BEFORE SOLAR

Read More »

Retail

Retail Initially, the retail store was not properly lighted. They were facing problems with safety and productivity. Plus the high power bill and high maintenance cost. These challenges made them

Read More »
commercial solar installer

Wyndham Community Schools

KEY PROJECT INFORMATION CASE STUDY Wyndham Community Schools Werribee, VIC Download Case Study INVESTMENT $49,000.00 PAYBACK PERIOD 49 Months SYSTEM SIZE 54.25 kW GENERATION 69.9MWh Wyndham Community Schools The ChallengeMost

Read More »

Greenwood Business Park

Greenwood Business Park Working on big projects is not new to Cyanergy. We have had a handful of significant and relatively complicated jobs that we have successfully completed. One of

Read More »

Warehouse

Warehouse Energy bills can be a large overhead in business, especially in a warehouse as Toll. The client approaches us about their warehouse lighting upgrade to reduce their overall cost

Read More »
Scroll to Top