commercial solar project

KEY PROJECT INFORMATION

CASE STUDY

The Healey Factory

Mitcham, VIC 3132

Investment

INVESTMENT

$56,035.00

Payback period

PAYBACK PERIOD

35 Months

System size

SYSTEM SIZE

59.4 kW

Generation

GENERATION

77.621MWh

commercial solar installations

YEARLY COST BEFORE SOLAR

$27,950.00

YEARLY COST AFTER SOLAR

$10,140.00

The Healey Factory Project

The Healey Factory has been in operation since the 1970s, and it has grown into a professional sales, service, parts, and restoration/accident repair facility. The Healey Factory staff is composed of 27 individuals who have a wealth of experience in racing, rallying, and car building.

The Healey Factory decided to invest in solar PV after being recommended to do so by previous clients. After investigating the financial return of solar PV, The Healey Factory found that it was still a worthwhile investment despite changes in the renewables sector.

The Challenge 

On average, auto dealerships consume more energy than a typical office building because of lighting and air conditioning and other workshop-related systems such as compressors and vehicle hoists.

The Solution

Cyanergy installed a 59.4kWp system was installed using high-quality smart PV panels and a 50kW inverter. Careful consideration was taken during the system’s design in order to avoid shading from the upper roof and cladding upstands.

commercial solar installations

Contact us today to learn more about how commercial solar can work for your business

Recent Projects

Fuel Stations

Fuel Stations Bright and clear canopy lighting increases a sense of safety and the comfort that can make the difference between “let’s drive on to the next one” to “let’s

Read More »

Commercial Joinery Company

KEY PROJECT INFORMATION CASE STUDY Commercial Joinery Company Dandenong, VIC Download Case Study INVESTMENT $75,000.00 PAYBACK PERIOD 6 Years MONTHLY SAVINGS $1017.67 SYSTEM SIZE: 99.82 kW GENERATION 127.75 MWh YEARLY

Read More »

All Glass Recycling | Commercial Solar Installation

Are you interested in how All Glass Recycling, a leading player in the recycling industry, achieved significant cost savings and environmental sustainability through solar energy? Read on to discover how Cyanergy’s solar panel solution transformed All Glass Recycling’s operations.

Read More »

The Coffee Carteli | Commercial Solar Installation

The Bean Cartel, a renowned coffee roasting company based in Notting Hill, Victoria, made a strategic investment in solar energy to enhance sustainability efforts and reduce operational costs. With the assistance of Cyanergy, The Bean Cartel successfully installed a solar array comprising 41 JASolar panels on the roof of their warehouse.

Read More »