![commercial solar project](https://cyanergy.com.au/wp-content/uploads/2022/12/dji_export_1663119517618-min-scaled-1024x576.jpg)
KEY PROJECT INFORMATION
![Investment](https://cyanergy.com.au/wp-content/uploads/2022/09/Investment-150x150.png)
INVESTMENT
$56,035.00
![Payback period](https://cyanergy.com.au/wp-content/uploads/2022/09/Payback-period-150x150.png)
PAYBACK PERIOD
35 Months
![System size](https://cyanergy.com.au/wp-content/uploads/2022/09/System-size-01-150x150.png)
SYSTEM SIZE
59.4 kW
![Generation](https://cyanergy.com.au/wp-content/uploads/2022/09/Generation-01-150x150.png)
GENERATION
77.621MWh
![commercial solar installations](https://cyanergy.com.au/wp-content/uploads/2022/12/Healey-Factory-scaled-2048x640.jpg)
YEARLY COST BEFORE SOLAR
$27,950.00
YEARLY COST AFTER SOLAR
$10,140.00
The Healey Factory Project
The Healey Factory has been in operation since the 1970s, and it has grown into a professional sales, service, parts, and restoration/accident repair facility. The Healey Factory staff is composed of 27 individuals who have a wealth of experience in racing, rallying, and car building.
The Healey Factory decided to invest in solar PV after being recommended to do so by previous clients. After investigating the financial return of solar PV, The Healey Factory found that it was still a worthwhile investment despite changes in the renewables sector.
The ChallengeÂ
On average, auto dealerships consume more energy than a typical office building because of lighting and air conditioning and other workshop-related systems such as compressors and vehicle hoists.
The Solution
Cyanergy installed a 59.4kWp system was installed using high-quality smart PV panels and a 50kW inverter. Careful consideration was taken during the system’s design in order to avoid shading from the upper roof and cladding upstands.
![commercial solar installations](https://cyanergy.com.au/wp-content/uploads/2022/12/dji_export_1663119328985-scaled.jpg)
![](https://cyanergy.com.au/wp-content/uploads/2022/12/WhatsApp-Image-2022-09-15-at-12.01.34-PM-1-1-1024x768.jpeg)
Contact us today to learn more about how commercial solar can work for your business
Recent Projects
![](https://cyanergy.com.au/wp-content/uploads/2023/06/8b138b79-4192-4179-a3ef-82655a48eff9-300x225.jpg)
Philter Brewing | Commercial Solar Installation
KEY PROJECT INFORMATION CASE STUDY Philter Brewing Pty LTD Marrickville NSW 2204 Download Case Study INVESTMENT $82,227.75 PAYBACK 34 Months M / SAVINGS $2,427.00 SYSTEM SIZE 86kW GENERATION 119.99MWh YEARLY
![](https://cyanergy.com.au/wp-content/uploads/2023/07/DJI_0394-scaled-300x169.jpg)
Shine Apartments | Commercial Solar Installation
KEY PROJECT INFORMATION CASE STUDY Shine Apartments Campsie, NSW 2204 Download Case Study INVESTMENT $38,294.00 PAYBACKÂ 37 Months M / SAVINGS $910.00 SYSTEM SIZE 39.6kW GENERATION 54.65MWh YEARLY COST BEFORE
![](https://cyanergy.com.au/wp-content/uploads/2022/07/animal-emergency-centre-gallergy--300x250.jpg)
Animal Health
Animal Health When the Animal Emergency Center moved their office to East Melbourne, they realized that the lighting I the premises was not up to the standard. They called us
![](https://cyanergy.com.au/wp-content/uploads/2023/03/Rectangle-15-300x185.jpg)
Lilydale Service Group
KEY PROJECT INFORMATION CASE STUDY Lilydale Service Group Lilydale, VIC Download Case Study INVESTMENT $33,651.96 PAYBACK PERIOD 32 Months MONTHLY SAVINGS $887.50 SYSTEM SIZE 38.15kW GENERATION 53.973MWh YEARLY COST BEFORE
![](https://cyanergy.com.au/wp-content/uploads/2022/08/107887_CLU-Area-4-Post-installation-Photo-of-Area--300x250.jpg)
Retail
Retail Initially, the retail store was not properly lighted. They were facing problems with safety and productivity. Plus the high power bill and high maintenance cost. These challenges made them
![](https://cyanergy.com.au/wp-content/uploads/2023/12/2c33b038-dbeb-4c43-a5e2-22818a4b0269-300x225.jpg)
All Glass Recycling | Commercial Solar Installation
Are you interested in how All Glass Recycling, a leading player in the recycling industry, achieved significant cost savings and environmental sustainability through solar energy? Read on to discover how Cyanergy’s solar panel solution transformed All Glass Recycling’s operations.