KEY PROJECT INFORMATION
INVESTMENT
$33,651.96
PAYBACK PERIOD
32 Months
MONTHLY SAVINGS
$887.50
SYSTEM SIZE
38.15kW
GENERATION
53.973MWh
YEARLY COST BEFORE SOLAR
$14,900.00
YEARLY COST AFTER SOLAR
$4,250.00
Lilydale Service Group
Lilydale Service center is owned and operated by Martin Phillips, with 20 years of experience as a former owner of the award-winning Waverley Service Centre.
Martin was looking for a smarter and more sustainable option to reduce his current power bill. After discussing his options with the Cyanergy team, Martin made an investment of 33k in a 38kW solar system. This system has an estimated annual production of 53.973MWh, with a payback period of 32 months.
Before investing in solar, the service group’s power cost was 14K per annum. After the installation of the solar system, the power cost has been reduced to 4K per annum.
The Lilydale Service Group is now experiencing the following benefits:
- Reduced power costs: By investing in a solar system, the Lilydale Service Group has been able to reduce its power costs from 14K to 4K.
- Increased sustainability: The Lilydale Service Group is now able to do its part in reducing its carbon footprint and promoting sustainability.
- Financial savings: Lilydale Service Group has seen significant financial savings since investing in the solar system.
The Lilydale Service Group’s solar installation is an example of how investing in renewable energy can be beneficial to businesses.
Not only does the installation provide a cost-effective way to reduce energy costs, but it also helps to reduce the group’s carbon footprint. Investing in renewable energy is a win-win for all involved.
The Lilydale Service Group’s solar installation is a success story that other businesses should take note of. Investing in renewable energy is a great way to reduce operational costs and do your part for the environment.
Contact us today to learn more about how commercial solar can work for your business
Recent Projects
Commercial Joinery Company
KEY PROJECT INFORMATION CASE STUDY Commercial Joinery Company Dandenong, VIC Download Case Study INVESTMENT $75,000.00 PAYBACK PERIOD 6 Years MONTHLY SAVINGS $1017.67 SYSTEM SIZE: 99.82 kW GENERATION 127.75 MWh YEARLY
Greenwood Business Park
Greenwood Business Park Working on big projects is not new to Cyanergy. We have had a handful of significant and relatively complicated jobs that we have successfully completed. One of
Warehouse
Warehouse Energy bills can be a large overhead in business, especially in a warehouse as Toll. The client approaches us about their warehouse lighting upgrade to reduce their overall cost
Philter Brewing | Commercial Solar Installation
KEY PROJECT INFORMATION CASE STUDY Philter Brewing Pty LTD Marrickville NSW 2204 Download Case Study INVESTMENT $82,227.75 PAYBACK 34 Months M / SAVINGS $2,427.00 SYSTEM SIZE 86kW GENERATION 119.99MWh YEARLY
New life Aquarium
KEY PROJECT INFORMATION CASE STUDY New life Aquarium Keysborough, VIC Download Case Study INVESTMENT $31,250.00 PAYBACK PERIOD 38 Months MONTHLY SAVINGS $743.33 SYSTEM SIZE 40.5 kW GENERATION 51MWh YEARLY COST
Shine Apartments | Commercial Solar Installation
KEY PROJECT INFORMATION CASE STUDY Shine Apartments Campsie, NSW 2204 Download Case Study INVESTMENT $38,294.00 PAYBACK 37 Months M / SAVINGS $910.00 SYSTEM SIZE 39.6kW GENERATION 54.65MWh YEARLY COST BEFORE