KEY PROJECT INFORMATION
INVESTMENT
$82,227.75
PAYBACK
34 Months
M / SAVINGS
$2,427.00
SYSTEM SIZE
86kW
GENERATION
119.99MWh
YEARLY COST BEFORE SOLAR
$81,900.00
YEARLY COST AFTER SOLAR
$52,770.00
Philter Brewing
Philter Brewing is a forward-thinking brewery that places sustainability at the heart of its operations. Recognizing the potential of solar power, they sought a reliable partner to implement a commercial solar solution that aligned with their values. With a shared commitment to sustainability, Cyanergy was the ideal choice for Philter Brewing’s solar project.
Matthew, Cyanergy’s Sales Manager played a crucial role in understanding Philter Brewing’s energy requirements and tailoring a solar solution to meet their specific needs. After thorough analysis, Matthew proposed an 86 kW solar panel system that would maximize energy production and cost savings. Philter Brewing recognized the value in Cyanergy’s expertise and decided to move forward with the project.
Investment and Payback Period
The investment for Philter Brewing’s 86 kW solar panel system totalled $108,822.83. With an average monthly saving of $2,427.00, Philter Brewing is on track to recoup its investment within a remarkable 45 months. This payback period highlights the long-term financial benefits of embracing solar energy.
Yearly Savings & Energy Generation
Since the installation, Philter Brewing has experienced significant savings on their electricity bills. Prior to solar adoption, their annual electricity bill stood at $81,900.00. However, with their solar panel system generating 119.99 MWh of clean energy annually, their yearly bill has been reduced to just $52,770.00. This translates to yearly savings of $29,130.00, enabling Philter Brewing to allocate these funds towards further sustainability initiatives or business growth.
Philter Brewing’s transition to solar power with Cyanergy has been a resounding success. By embracing renewable energy, they have not only significantly reduced their carbon footprint but also achieved substantial financial savings.
The partnership between Philter Brewing and Cyanergy showcases the potential of solar energy in the commercial sector, serving as an inspiration for other businesses to follow suit.
Contact us today to learn more about how commercial solar can work for your business
Recent Projects
AC Laser | Commercial Solar Installation
A leading manufacturer based in Thomastown, Victoria, turned to Cyanergy to meet their solar energy needs. To reduce their escalating energy costs and increase sustainability, AC Laser invested $90,600 in a 99.45 kW solar system that generates 141.75 MWh annually.
Shine Apartments | Commercial Solar Installation
KEY PROJECT INFORMATION CASE STUDY Shine Apartments Campsie, NSW 2204 Download Case Study INVESTMENT $38,294.00 PAYBACKÂ 37 Months M / SAVINGS $910.00 SYSTEM SIZE 39.6kW GENERATION 54.65MWh YEARLY COST BEFORE
Uniplas Mouldings International | Commercial Solar Installation
Yearly energy cost before solar $647,005.00. Yearly energy cost after solar $456,097.00!
Manufacturing
Manufacturing To remain strong in industry, we scrutinize costs across every process. Lighting can account for up to 80% of a manufacturing warehouse energy bill so it must be as
Sparacino Farms | Commercial Solar Installation
Sparacino Farms reaching out to Cyanergy to explore options for reducing energy costs and enhancing sustainability. Cyanergy’s team conducted a thorough assessment of the farm’s energy needs and financial goals, offering a tailored solar solution that included a 99.76 kW system for the farm and a separate 27.7 kW system with battery storage for the residential property.
Ram Locksmith Project
KEY PROJECT INFORMATION CASE STUDY Ram Locksmith Dandenong, VIC Download Case Study INVESTMENT $31,820.00 PAYBACK PERIOD 39 Months MONTHLY SAVINGS $715.00 SYSTEM SIZE 40kW GENERATION 53.96MWh YEARLY COST BEFORE SOLAR