KEY PROJECT INFORMATION
INVESTMENT
$16,917.27
PAYBACK
21 Months
M / SAVINGS
$805.83
SYSTEM SIZE
32.56kW
GENERATION
41.395MWh
YEARLY COST BEFORE SOLAR
YEARLY COST AFTER SOLAR
Ashfield Bowling Club
Ashfield Bowling Club has made a significant investment of $16,917.20 in a 32.56 kW commercial solar energy system, which generates an impressive 41.395 MWh of energy annually. This initiative not only contributes to sustainability but also results in monthly savings of $805.83, leading to a payback period of just 12 months.
The club is committed to promoting a greener environment and enhancing its facilities for members and the community. By harnessing solar energy, Ashfield Bowling Club is setting a positive example in energy efficiency and environmental responsibility.
Challenges
Ashfield Bowling Club, a popular community hub in Ashfield, faced rising energy costs that threatened their ability to allocate funds to community programs and activities. With an annual energy bill of over $30k, the club sought a cost-effective and sustainable solution to manage energy expenses while reducing their carbon footprint.
Solution
Cyanergy, renowned for its expertise in commercial solar energy, partnered with Ashfield Bowling Club to design a tailored solar solution. The system included JA Solar 440W panels and a Goodwe 25 kW inverter, chosen for their superior performance and reliability.
The 32.56 kW system was designed to maximize energy generation and align with the club’s energy consumption patterns, ensuring optimal savings and long-term sustainability.
Results
The installation delivered exceptional results:
- Energy Bill Reduction: The club’s monthly energy savings now average $805.83, reducing their annual energy expenses by 60%.
- Energy Generation: The system generates 41.395 MWh annually, significantly decreasing reliance on grid electricity.
Payback Period: The club’s investment is expected to recover within 12 months, thanks to substantial energy savings and government subsidies.
Why Cyanergy
Ashfield Bowling Club chose Cyanergy for their:
- Expertise in Commercial Solar Energy: With a track record of success, Cyanergy understands the unique energy needs of community organizations.
- Tailored Solutions: The custom-designed system perfectly matched the club’s energy usage.
- Focus on Sustainability: Cyanergy’s solutions promote greener energy practices, aligning with the club’s values.
Exceptional Value: Through government rebates and high-quality equipment, Cyanergy ensured maximum savings for the club.
Project Conclusion
Ashfield Bowling Club’s transition to solar energy underscores the benefits of investing in renewable energy. With reduced operating costs and enhanced sustainability, the club can now focus more resources on serving its community. Cyanergy’s expertise and customer-centric approach made this transformation seamless and highly rewarding.
This success story highlights the potential for community organizations to achieve financial and environmental benefits through solar energy.
.
Contact us today to learn more about how commercial solar can work for your business
Recent Projects
Retail
Retail Initially, the retail store was not properly lighted. They were facing problems with safety and productivity. Plus the high power bill and high maintenance cost. These challenges made them
Healey Factory Project
KEY PROJECT INFORMATION CASE STUDY The Healey Factory Mitcham, VIC 3132 Download Case Study INVESTMENT $56,035.00 PAYBACK PERIOD 35 Months SYSTEM SIZE 59.4 kW GENERATION 77.621MWh YEARLY COST BEFORE SOLAR
VetLand Mitcham | Commercial Solar Installation
Vetland 24-Hour Animal Hospital in Mitcham, Victoria, Partners with Cyanergy for a Sustainable Future
Kew Golf Club | 99kW Commercial Solar Installation
Kew Golf Club, one of Victoria’s premier golfing destinations, was looking for a cost-effective solar energy solution to reduce its rising electricity costs and lower its carbon footprint
Multi-Site Age Care Facility Project
KEY PROJECT INFORMATION CASE STUDY Age-Care Facility Project Mitcham, VIC Download Case Study INVESTMENT $60,000.00 PAYBACK PERIOD 52.8 months MONTHLY SAVINGS $1,193.25 SYSTEM SIZE: 60 kW GENERATION 80.652 MWh Age
Wyndham Community Schools
KEY PROJECT INFORMATION CASE STUDY Wyndham Community Schools Werribee, VIC Download Case Study INVESTMENT $49,000.00 PAYBACK PERIOD 49 Months SYSTEM SIZE 54.25 kW GENERATION 69.9MWh Wyndham Community Schools The ChallengeMost