KEY PROJECT INFORMATION
INVESTMENT
$24,050
PAYBACK
26 Months
M / SAVINGS
$925
SYSTEM SIZE
39.6kW
GENERATION
47.32 MWh
YEARLY COST BEFORE SOLAR
YEARLY COST AFTER SOLAR
Creswick Tyrepower
Overview
Creswick Tyrepower, a leading automotive service provider, sought to reduce its electricity costs and improve sustainability through a tailored solar energy solution. With rising energy prices and a commitment to environmental responsibility, the business needed a reliable and cost-effective way to manage energy expenses.
Solution
To address their energy needs, we installed a 39.6kW solar system designed to optimise energy consumption and significantly cut electricity costs. The system was strategically sized to maximise efficiency and savings while ensuring long-term financial and environmental benefits.
Results
-
- Monthly Savings: $925
- Annual Savings: $11,100
- Return on Investment (ROI): 2 years and 2 months
- Energy Independence: Reduced reliance on grid electricity
- Sustainability: Significant reduction in carbon footprint
Impact
Why Tyrepower Locations Should Consider Solar
With high energy usage from lighting, equipment, and operations, Tyrepower locations can benefit greatly from a tailored solar installation. The success of Creswick Tyrepower demonstrates the financial and environmental advantages that solar energy can bring to automotive businesses.
If you’re interested in reducing your energy bills and improving sustainability, now is the perfect time to explore solar solutions for your Tyrepower location. Contact us today to discuss how we can help your business achieve similar savings and benefits.
Contact us today to learn more about how commercial solar can work for your business
Recent Projects
Philter Brewing | Commercial Solar Installation
KEY PROJECT INFORMATION CASE STUDY Philter Brewing Pty LTD Marrickville NSW 2204 Download Case Study INVESTMENT $82,227.75 PAYBACK 34 Months M / SAVINGS $2,427.00 SYSTEM SIZE 86kW GENERATION 119.99MWh YEARLY
Greenwood Business Park
Greenwood Business Park Working on big projects is not new to Cyanergy. We have had a handful of significant and relatively complicated jobs that we have successfully completed. One of
Animal Health
Animal Health When the Animal Emergency Center moved their office to East Melbourne, they realized that the lighting I the premises was not up to the standard. They called us
Wyndham Community Schools
KEY PROJECT INFORMATION CASE STUDY Wyndham Community Schools Werribee, VIC Download Case Study INVESTMENT $49,000.00 PAYBACK PERIOD 49 Months SYSTEM SIZE 54.25 kW GENERATION 69.9MWh Wyndham Community Schools The ChallengeMost
Whites Glenola Hay Far | Commercial Solar Installation
Yearly energy cost before solar $8750.00. Yearly energy cost after solar $428.00
Sparacino Farms | Commercial Solar Installation
Sparacino Farms reaching out to Cyanergy to explore options for reducing energy costs and enhancing sustainability. Cyanergy’s team conducted a thorough assessment of the farm’s energy needs and financial goals, offering a tailored solar solution that included a 99.76 kW system for the farm and a separate 27.7 kW system with battery storage for the residential property.