KEY PROJECT INFORMATION

CASE STUDY

Creswick Tyrepower

Wendouree VIC

Investment

INVESTMENT

$24,050

Payback period

PAYBACK 

26 Months

M / SAVINGS

$925

System size

SYSTEM SIZE

39.6kW

Generation

GENERATION

47.32 MWh

YEARLY COST BEFORE SOLAR

$16,392.00
YEARLY COST BEFORE SOLAR 100%

YEARLY COST AFTER SOLAR

$5,172.00
YEARLY COST AFTER SOLAR 31.5%

Creswick Tyrepower

Overview

Creswick Tyrepower, a leading automotive service provider, sought to reduce its electricity costs and improve sustainability through a tailored solar energy solution. With rising energy prices and a commitment to environmental responsibility, the business needed a reliable and cost-effective way to manage energy expenses.

Solution

To address their energy needs, we installed a 39.6kW solar system designed to optimise energy consumption and significantly cut electricity costs. The system was strategically sized to maximise efficiency and savings while ensuring long-term financial and environmental benefits.

Results

    • Monthly Savings: $925
    • Annual Savings: $11,100
    • Return on Investment (ROI): 2 years and 2 months
    • Energy Independence: Reduced reliance on grid electricity
    • Sustainability: Significant reduction in carbon footprint

Impact

Since the installation, Creswick Tyrepower has experienced substantial cost savings, allowing the business to reinvest in other operational areas. Additionally, the transition to solar aligns with growing consumer demand for environmentally responsible businesses, giving them a competitive edge in the market.

Why Tyrepower Locations Should Consider Solar

With high energy usage from lighting, equipment, and operations, Tyrepower locations can benefit greatly from a tailored solar installation. The success of Creswick Tyrepower demonstrates the financial and environmental advantages that solar energy can bring to automotive businesses.

If you’re interested in reducing your energy bills and improving sustainability, now is the perfect time to explore solar solutions for your Tyrepower location. Contact us today to discuss how we can help your business achieve similar savings and benefits.

Contact us today to learn more about how commercial solar can work for your business

Recent Projects

Berwick Mitsubishi | Commercial Solar Installation

Mitsubishi Berwick, a distinguished automotive dealership dedicated to sustainability and environmental stewardship, embarked on a strategic initiative to align its green ethos by integrating renewable energy into its operations. Mitsubishi Berwick strategically partnered with Cyanergy, a premier commercial solar installation company.

Read More »
commercial solar project

Healey Factory Project

KEY PROJECT INFORMATION CASE STUDY The Healey Factory Mitcham, VIC 3132 Download Case Study INVESTMENT $56,035.00 PAYBACK PERIOD 35 Months SYSTEM SIZE 59.4 kW GENERATION 77.621MWh YEARLY COST BEFORE SOLAR

Read More »

The Bean Cartel | Commercial Solar Installation

The Bean Cartel, a renowned coffee roasting company based in Notting Hill, Victoria, made a strategic investment in solar energy to enhance sustainability efforts and reduce operational costs. With the assistance of Cyanergy, The Bean Cartel successfully installed a solar array comprising 41 JASolar panels on the roof of their warehouse.

Read More »
Commercial solar systems

New life Aquarium

KEY PROJECT INFORMATION CASE STUDY New life Aquarium Keysborough, VIC Download Case Study INVESTMENT $31,250.00 PAYBACK PERIOD 38 Months MONTHLY SAVINGS $743.33 SYSTEM SIZE 40.5 kW GENERATION 51MWh YEARLY COST

Read More »

Residential Case-studies

Residential The owner partnered with us with a primary goal of reducing their power bill of more or less $850 a quarter and ever-recurring maintenance costs. Immediately, Cyanergy’s assessment offered

Read More »
Scroll to Top