KEY PROJECT INFORMATION
INVESTMENT
$38,377.00
PAYBACKÂ
45 Months
M / SAVINGS
$750.00
SYSTEM SIZE
39.6kW
GENERATION
47.32MWh
YEARLY COST BEFORE SOLAR
$26,720.00
YEARLY COST AFTER SOLAR
$17,770.00
Specialized
The partnership between Cyanergy and Specialized was a natural fit, driven by shared values and a commitment to environmental sustainability. Specialized, a leader in the cycling industry, has long been dedicated to pedaling the planet forward by delivering safe, high-performing, and durable bikes while minimizing its environmental footprint.
Specialized’s core values, including respect for people and the planet, align closely with Cyanergy’s mission to promote renewable energy adoption and reduce carbon emissions. By investing in solar energy and partnering with Cyanergy, Specialized demonstrates its dedication to responsible manufacturing and design, waste reduction, and climate action.
Project Overview
Specialized, a renowned name in the cycling industry, embarked on a strategic sustainability initiative by investing in solar energy at its manufacturing facility in Port Melbourne, Victoria. Partnering with Cyanergy, Specialized aimed to enhance its environmental stewardship while simultaneously reducing operational costs. The initiative involved the installation of a solar array on the facility’s roof, comprising cutting-edge solar panels.
System Configuration
Solar Panels: Specialized’s solar array consists of 41 high-efficiency solar panels manufactured by a leading provider in the industry.
Inverter: The system is integrated with a Sungrow SG15RT inverter, boasting a maximum AC output of 15.00 kW.
Panel Details: The solar array incorporates JA Solar JAM54D40-440/LB/1500V panels, each with a maximum DC power output of 18.04 kW.
Benefits and Impact
The adoption of solar energy at Specialized’s Port Melbourne facility represents a significant step towards sustainability and cost reduction. By harnessing solar power, Specialized can offset a substantial portion of its energy consumption, leading to various benefits:
Environmental Sustainability: Specialized’s commitment to solar energy aligns with its mission to reduce carbon emissions and minimize environmental impact. Solar energy production mitigates reliance on fossil fuels, contributing to cleaner air and a healthier planet.
Cost Savings: The integration of solar power allows Specialized to reduce its dependence on grid electricity, resulting in significant cost savings over time. By generating renewable energy on-site, the company can lower its operational expenses and improve financial performance.
Conclusion
Specialized’s investment in solar energy exemplifies its dedication to sustainable practices and responsible business operations. By partnering with Cyanergy and embracing solar technology, Specialized demonstrates leadership in environmental conservation within the cycling industry. As the company continues to prioritize sustainability, it sets a precedent for other businesses seeking to align profitability with planet-friendly practices
Contact us today to learn more about how commercial solar can work for your business
Recent Projects
School
School This LED upgrade for a primary school in McKinnon, Victoria is a well-thought decision. It was high time for the school to find a solution to their sky-high energy
Shine Apartments | Commercial Solar Installation
KEY PROJECT INFORMATION CASE STUDY Shine Apartments Campsie, NSW 2204 Download Case Study INVESTMENT $38,294.00 PAYBACKÂ 37 Months M / SAVINGS $910.00 SYSTEM SIZE 39.6kW GENERATION 54.65MWh YEARLY COST BEFORE
Wyndham Community Schools
KEY PROJECT INFORMATION CASE STUDY Wyndham Community Schools Werribee, VIC Download Case Study INVESTMENT $49,000.00 PAYBACK PERIOD 49 Months SYSTEM SIZE 54.25 kW GENERATION 69.9MWh Wyndham Community Schools The ChallengeMost
Retail
Retail Initially, the retail store was not properly lighted. They were facing problems with safety and productivity. Plus the high power bill and high maintenance cost. These challenges made them
Multi-Site Age Care Facility Project
KEY PROJECT INFORMATION CASE STUDY Age-Care Facility Project Mitcham, VIC Download Case Study INVESTMENT $60,000.00 PAYBACK PERIOD 52.8 months MONTHLY SAVINGS $1,193.25 SYSTEM SIZE: 60 kW GENERATION 80.652 MWh Age
Greenwood Business Park
Greenwood Business Park Working on big projects is not new to Cyanergy. We have had a handful of significant and relatively complicated jobs that we have successfully completed. One of