KEY PROJECT INFORMATION

CASE STUDY

VetLand Mitcham

Mitcham VIC

Investment

INVESTMENT

$90,735.00

Payback period

PAYBACK 

36 Months

M / SAVINGS

$2,276

System size

SYSTEM SIZE

118.32kW

Generation

GENERATION

134,781 MWh

YEARLY COST BEFORE SOLAR

$90,735.00
YEARLY COST BEFORE SOLAR 70%

YEARLY COST AFTER SOLAR

$63,419.00
YEARLY COST AFTER SOLAR 50%

VetLand Mitcham

Vetland 24-Hour Animal Hospital is setting a remarkable example in sustainability by collaborating with Cyanergy to install a state-of-the-art solar energy system. Designed to meet the unique energy demands of 24/7 veterinary care, this advanced system powers round-the-clock services for furry friends while significantly reducing environmental impact.

With Cyanergy’s expertise, Vetland is now saving an impressive $27,316 annually on energy costs. These savings free up valuable resources, allowing the hospital to focus on delivering exceptional care to its patients. At the same time, the hospital has taken a giant step toward reducing its carbon footprint, reinforcing its commitment to a greener future.

The system, equipped with hybrid inverters, is future-ready for battery expansion and integrates seamlessly with a generator to ensure uninterrupted power during blackouts. This means Vetland can continue providing reliable care no matter the circumstances—proving that sustainability and operational excellence go hand in hand.

Through research and innovation, Cyanergy has developed a tailored solution that meets Vetland’s specific needs while paving the way for a more sustainable veterinary industry. Vetland’s partnership with Cyanergy demonstrates that investing in renewable energy is not only good for the environment but also a smart financial decision that benefits pets, people, and the planet.

For veterinary practices looking to reduce costs and embrace sustainability, Vetland’s success story with Cyanergy is an inspiring example of what’s possible.

Contact us today to learn more about how commercial solar can work for your business

Recent Projects

commercial solar installer

Wyndham Community Schools

KEY PROJECT INFORMATION CASE STUDY Wyndham Community Schools Werribee, VIC Download Case Study INVESTMENT $49,000.00 PAYBACK PERIOD 49 Months SYSTEM SIZE 54.25 kW GENERATION 69.9MWh Wyndham Community Schools The ChallengeMost

Read More »

Manufacturing

Manufacturing To remain strong in industry, we scrutinize costs across every process. Lighting can account for up to 80% of a manufacturing warehouse energy bill so it must be as

Read More »

Lilydale Service Group

KEY PROJECT INFORMATION CASE STUDY Lilydale Service Group Lilydale, VIC Download Case Study INVESTMENT $33,651.96 PAYBACK PERIOD 32 Months MONTHLY SAVINGS $887.50 SYSTEM SIZE 38.15kW GENERATION 53.973MWh YEARLY COST BEFORE

Read More »

Specialized | Commercial Solar Installation

Specialized, a renowned name in the cycling industry, embarked on a strategic sustainability initiative by investing in solar energy at its manufacturing facility in Port Melbourne, Victoria. Partnering with Cyanergy, Specialized aimed to enhance its environmental stewardship while simultaneously reducing operational costs. The initiative involved the installation of a solar array on the facility’s roof, comprising cutting-edge solar panels

Read More »

Restaurant

Restaurant As we lead our way through LED technology, we slowly influenced different types of industries including the restaurants, Thus, we slowly transform how businesses see and think the importance

Read More »
Scroll to Top