KEY PROJECT INFORMATION

INVESTMENT
$90,735.00

PAYBACKÂ
36 Months

M / SAVINGS
$2,276

SYSTEM SIZE
118.32kW

GENERATION
134,781 MWh
YEARLY COST BEFORE SOLAR
YEARLY COST AFTER SOLAR
VetLand Mitcham
Vetland 24-Hour Animal Hospital is setting a remarkable example in sustainability by collaborating with Cyanergy to install a state-of-the-art solar energy system. Designed to meet the unique energy demands of 24/7 veterinary care, this advanced system powers round-the-clock services for furry friends while significantly reducing environmental impact.
With Cyanergy’s expertise, Vetland is now saving an impressive $27,316 annually on energy costs. These savings free up valuable resources, allowing the hospital to focus on delivering exceptional care to its patients. At the same time, the hospital has taken a giant step toward reducing its carbon footprint, reinforcing its commitment to a greener future.
The system, equipped with hybrid inverters, is future-ready for battery expansion and integrates seamlessly with a generator to ensure uninterrupted power during blackouts. This means Vetland can continue providing reliable care no matter the circumstances—proving that sustainability and operational excellence go hand in hand.
Through research and innovation, Cyanergy has developed a tailored solution that meets Vetland’s specific needs while paving the way for a more sustainable veterinary industry. Vetland’s partnership with Cyanergy demonstrates that investing in renewable energy is not only good for the environment but also a smart financial decision that benefits pets, people, and the planet.
For veterinary practices looking to reduce costs and embrace sustainability, Vetland’s success story with Cyanergy is an inspiring example of what’s possible.


Contact us today to learn more about how commercial solar can work for your business
Recent Projects

Wyndham Community Schools
KEY PROJECT INFORMATION CASE STUDY Wyndham Community Schools Werribee, VIC Download Case Study INVESTMENT $49,000.00 PAYBACK PERIOD 49 Months SYSTEM SIZE 54.25 kW GENERATION 69.9MWh Wyndham Community Schools The ChallengeMost

Manufacturing
Manufacturing To remain strong in industry, we scrutinize costs across every process. Lighting can account for up to 80% of a manufacturing warehouse energy bill so it must be as

Lilydale Service Group
KEY PROJECT INFORMATION CASE STUDY Lilydale Service Group Lilydale, VIC Download Case Study INVESTMENT $33,651.96 PAYBACK PERIOD 32 Months MONTHLY SAVINGS $887.50 SYSTEM SIZE 38.15kW GENERATION 53.973MWh YEARLY COST BEFORE

Specialized | Commercial Solar Installation
Specialized, a renowned name in the cycling industry, embarked on a strategic sustainability initiative by investing in solar energy at its manufacturing facility in Port Melbourne, Victoria. Partnering with Cyanergy, Specialized aimed to enhance its environmental stewardship while simultaneously reducing operational costs. The initiative involved the installation of a solar array on the facility’s roof, comprising cutting-edge solar panels

Froliq Early Learning | 26.4kW Solar Installation
Kew Golf Club, one of Victoria’s premier golfing destinations, was looking for a cost-effective solar energy solution to reduce its rising electricity costs and lower its carbon footprint

Restaurant
Restaurant As we lead our way through LED technology, we slowly influenced different types of industries including the restaurants, Thus, we slowly transform how businesses see and think the importance