KEY PROJECT INFORMATION

CASE STUDY

VetLand Mitcham

Mitcham VIC

Investment

INVESTMENT

$90,735.00

Payback period

PAYBACK 

36 Months

M / SAVINGS

$2,276

System size

SYSTEM SIZE

118.32kW

Generation

GENERATION

134,781 MWh

YEARLY COST BEFORE SOLAR

$90,735.00
YEARLY COST BEFORE SOLAR 70%

YEARLY COST AFTER SOLAR

$63,419.00
YEARLY COST AFTER SOLAR 50%

VetLand Mitcham

Vetland 24-Hour Animal Hospital is setting a remarkable example in sustainability by collaborating with Cyanergy to install a state-of-the-art solar energy system. Designed to meet the unique energy demands of 24/7 veterinary care, this advanced system powers round-the-clock services for furry friends while significantly reducing environmental impact.

With Cyanergy’s expertise, Vetland is now saving an impressive $27,316 annually on energy costs. These savings free up valuable resources, allowing the hospital to focus on delivering exceptional care to its patients. At the same time, the hospital has taken a giant step toward reducing its carbon footprint, reinforcing its commitment to a greener future.

The system, equipped with hybrid inverters, is future-ready for battery expansion and integrates seamlessly with a generator to ensure uninterrupted power during blackouts. This means Vetland can continue providing reliable care no matter the circumstances—proving that sustainability and operational excellence go hand in hand.

Through research and innovation, Cyanergy has developed a tailored solution that meets Vetland’s specific needs while paving the way for a more sustainable veterinary industry. Vetland’s partnership with Cyanergy demonstrates that investing in renewable energy is not only good for the environment but also a smart financial decision that benefits pets, people, and the planet.

For veterinary practices looking to reduce costs and embrace sustainability, Vetland’s success story with Cyanergy is an inspiring example of what’s possible.

Contact us today to learn more about how commercial solar can work for your business

Recent Projects

All Glass Recycling | Commercial Solar Installation

Are you interested in how All Glass Recycling, a leading player in the recycling industry, achieved significant cost savings and environmental sustainability through solar energy? Read on to discover how Cyanergy’s solar panel solution transformed All Glass Recycling’s operations.

Read More »

Commercial Joinery Company

KEY PROJECT INFORMATION CASE STUDY Commercial Joinery Company Dandenong, VIC Download Case Study INVESTMENT $75,000.00 PAYBACK PERIOD 6 Years MONTHLY SAVINGS $1017.67 SYSTEM SIZE: 99.82 kW GENERATION 127.75 MWh YEARLY

Read More »

AC Laser | Commercial Solar Installation

A leading manufacturer based in Thomastown, Victoria, turned to Cyanergy to meet their solar energy needs. To reduce their escalating energy costs and increase sustainability, AC Laser invested $90,600 in a 99.45 kW solar system that generates 141.75 MWh annually.

Read More »
commercial solar project

Healey Factory Project

KEY PROJECT INFORMATION CASE STUDY The Healey Factory Mitcham, VIC 3132 Download Case Study INVESTMENT $56,035.00 PAYBACK PERIOD 35 Months SYSTEM SIZE 59.4 kW GENERATION 77.621MWh YEARLY COST BEFORE SOLAR

Read More »

Animal Health

Animal Health When the Animal Emergency Center moved their office to East Melbourne, they realized that the lighting I the premises was not up to the standard. They called us

Read More »
Scroll to Top