KEY PROJECT INFORMATION
INVESTMENT
$90,735.00
PAYBACK
36 Months
M / SAVINGS
$2,276
SYSTEM SIZE
118.32kW
GENERATION
134,781 MWh
YEARLY COST BEFORE SOLAR
YEARLY COST AFTER SOLAR
VetLand Mitcham
Vetland 24-Hour Animal Hospital is setting a remarkable example in sustainability by collaborating with Cyanergy to install a state-of-the-art solar energy system. Designed to meet the unique energy demands of 24/7 veterinary care, this advanced system powers round-the-clock services for furry friends while significantly reducing environmental impact.
With Cyanergy’s expertise, Vetland is now saving an impressive $27,316 annually on energy costs. These savings free up valuable resources, allowing the hospital to focus on delivering exceptional care to its patients. At the same time, the hospital has taken a giant step toward reducing its carbon footprint, reinforcing its commitment to a greener future.
The system, equipped with hybrid inverters, is future-ready for battery expansion and integrates seamlessly with a generator to ensure uninterrupted power during blackouts. This means Vetland can continue providing reliable care no matter the circumstances—proving that sustainability and operational excellence go hand in hand.
Through research and innovation, Cyanergy has developed a tailored solution that meets Vetland’s specific needs while paving the way for a more sustainable veterinary industry. Vetland’s partnership with Cyanergy demonstrates that investing in renewable energy is not only good for the environment but also a smart financial decision that benefits pets, people, and the planet.
For veterinary practices looking to reduce costs and embrace sustainability, Vetland’s success story with Cyanergy is an inspiring example of what’s possible.
Contact us today to learn more about how commercial solar can work for your business
Recent Projects
Creswick Tyrepower | 39KW Solar Installation
Kew Golf Club, one of Victoria’s premier golfing destinations, was looking for a cost-effective solar energy solution to reduce its rising electricity costs and lower its carbon footprint
School
School This LED upgrade for a primary school in McKinnon, Victoria is a well-thought decision. It was high time for the school to find a solution to their sky-high energy
Multi-Site Age Care Facility Project
KEY PROJECT INFORMATION CASE STUDY Age-Care Facility Project Mitcham, VIC Download Case Study INVESTMENT $60,000.00 PAYBACK PERIOD 52.8 months MONTHLY SAVINGS $1,193.25 SYSTEM SIZE: 60 kW GENERATION 80.652 MWh Age
Healey Factory Project
KEY PROJECT INFORMATION CASE STUDY The Healey Factory Mitcham, VIC 3132 Download Case Study INVESTMENT $56,035.00 PAYBACK PERIOD 35 Months SYSTEM SIZE 59.4 kW GENERATION 77.621MWh YEARLY COST BEFORE SOLAR
Sixt Car Rental | Commercial Solar Installation
Sixt Car Rental reached out to Cyanergy to explore options for reducing energy costs and enhancing sustainability.
The Bean Cartel | Commercial Solar Installation
The Bean Cartel, a renowned coffee roasting company based in Notting Hill, Victoria, made a strategic investment in solar energy to enhance sustainability efforts and reduce operational costs. With the assistance of Cyanergy, The Bean Cartel successfully installed a solar array comprising 41 JASolar panels on the roof of their warehouse.