commercial solar installer

KEY PROJECT INFORMATION

CASE STUDY

Wyndham Community Schools

Werribee, VIC

Investment

INVESTMENT

$49,000.00

Payback period

PAYBACK PERIOD

49 Months

System size

SYSTEM SIZE

54.25 kW

Generation

GENERATION

69.9MWh

school solar project

Wyndham Community Schools

The Challenge
Most schools are in control of their own budgets with energy costs forming a significant part of the annual budget.
Careful decisions need to be made to ensure that the school’s funds are spent wisely maximizing the provision to the children and creating the best possible learning environment.

The Solution
Cyanergy worked alongside the community group to install around 90kW of solar panels on 3 schools across Wyndham.

The solar System installed by Cyanergy will give the schools an increased level of energy independence and a guaranteed fixed low-cost rate of electricity for all of the energy generated by the solar panels for the next 20 years.

Social Responsibility
At Cyanergy we are passionate about renewable energy and we believe that the next generation should be aware and educated about the environmental and financial benefits of renewables.
Giving back

Educating for the future
After the installation of these solar panels in Wyndham and the schools carrying out morning assemblies and teach the children about the benefits of the solar panels that they had just had installed.

Learning from data
Cynergy installed a full detailed monitoring system for the schools and the children can look at the data and carry out classroom projects to see just how much benefit the solar panels are making to their school.

commercial solar installer

Contact us today to learn more about how commercial solar can work for your business

Recent Projects

commercial solar project

Healey Factory Project

KEY PROJECT INFORMATION CASE STUDY The Healey Factory Mitcham, VIC 3132 Download Case Study INVESTMENT $56,035.00 PAYBACK PERIOD 35 Months SYSTEM SIZE 59.4 kW GENERATION 77.621MWh YEARLY COST BEFORE SOLAR

Read More »

Berwick Mitsubishi | Commercial Solar Installation

Mitsubishi Berwick, a distinguished automotive dealership dedicated to sustainability and environmental stewardship, embarked on a strategic initiative to align its green ethos by integrating renewable energy into its operations. Mitsubishi Berwick strategically partnered with Cyanergy, a premier commercial solar installation company.

Read More »

Specialized | Commercial Solar Installation

Specialized, a renowned name in the cycling industry, embarked on a strategic sustainability initiative by investing in solar energy at its manufacturing facility in Port Melbourne, Victoria. Partnering with Cyanergy, Specialized aimed to enhance its environmental stewardship while simultaneously reducing operational costs. The initiative involved the installation of a solar array on the facility’s roof, comprising cutting-edge solar panels

Read More »

Ram Locksmith Project

KEY PROJECT INFORMATION CASE STUDY Ram Locksmith Dandenong, VIC Download Case Study INVESTMENT $31,820.00 PAYBACK PERIOD 39 Months MONTHLY SAVINGS $715.00 SYSTEM SIZE 40kW GENERATION 53.96MWh YEARLY COST BEFORE SOLAR

Read More »

Warehouse

Warehouse Energy bills can be a large overhead in business, especially in a warehouse as Toll. The client approaches us about their warehouse lighting upgrade to reduce their overall cost

Read More »

All Glass Recycling | Commercial Solar Installation

Are you interested in how All Glass Recycling, a leading player in the recycling industry, achieved significant cost savings and environmental sustainability through solar energy? Read on to discover how Cyanergy’s solar panel solution transformed All Glass Recycling’s operations.

Read More »
Scroll to Top