KEY PROJECT INFORMATION
INVESTMENT
$49,000.00
PAYBACK PERIOD
49 Months
SYSTEM SIZE
54.25 kW
GENERATION
69.9MWh
Wyndham Community Schools
The Challenge
Most schools are in control of their own budgets with energy costs forming a significant part of the annual budget.
Careful decisions need to be made to ensure that the school’s funds are spent wisely maximizing the provision to the children and creating the best possible learning environment.
The Solution
Cyanergy worked alongside the community group to install around 90kW of solar panels on 3 schools across Wyndham.
The solar System installed by Cyanergy will give the schools an increased level of energy independence and a guaranteed fixed low-cost rate of electricity for all of the energy generated by the solar panels for the next 20 years.
Social Responsibility
At Cyanergy we are passionate about renewable energy and we believe that the next generation should be aware and educated about the environmental and financial benefits of renewables.
Giving back
Educating for the future
After the installation of these solar panels in Wyndham and the schools carrying out morning assemblies and teach the children about the benefits of the solar panels that they had just had installed.
Learning from data
Cynergy installed a full detailed monitoring system for the schools and the children can look at the data and carry out classroom projects to see just how much benefit the solar panels are making to their school.
Contact us today to learn more about how commercial solar can work for your business
Recent Projects
Retail
Retail Initially, the retail store was not properly lighted. They were facing problems with safety and productivity. Plus the high power bill and high maintenance cost. These challenges made them
Healey Factory Project
KEY PROJECT INFORMATION CASE STUDY The Healey Factory Mitcham, VIC 3132 Download Case Study INVESTMENT $56,035.00 PAYBACK PERIOD 35 Months SYSTEM SIZE 59.4 kW GENERATION 77.621MWh YEARLY COST BEFORE SOLAR
Uniplas Mouldings International | Commercial Solar Installation
Yearly energy cost before solar $647,005.00. Yearly energy cost after solar $456,097.00!
Snap Fitness | 78.88 kW Solar Installation
Kew Golf Club, one of Victoria’s premier golfing destinations, was looking for a cost-effective solar energy solution to reduce its rising electricity costs and lower its carbon footprint
Froliq Early Learning | 26.4kW Solar Installation
Kew Golf Club, one of Victoria’s premier golfing destinations, was looking for a cost-effective solar energy solution to reduce its rising electricity costs and lower its carbon footprint
Multi-Site Age Care Facility Project
KEY PROJECT INFORMATION CASE STUDY Age-Care Facility Project Mitcham, VIC Download Case Study INVESTMENT $60,000.00 PAYBACK PERIOD 52.8 months MONTHLY SAVINGS $1,193.25 SYSTEM SIZE: 60 kW GENERATION 80.652 MWh Age