KEY PROJECT INFORMATION

CASE STUDY

All Glass Recycling

Dandenong, VIC 3175

Investment

INVESTMENT

$71,867.00

Payback period

PAYBACK 

47 Months

M / SAVINGS

$1,108.83

System size

SYSTEM SIZE

73.7kW

Generation

GENERATION

100 MWh

YEARLY COST BEFORE SOLAR

$13,200.00

YEARLY COST AFTER SOLAR

-$106.00

All Glass Recycling

All Glass Recycling, originally G&S Recycling, has been a pivotal figure in recycling since 1980. Evolving from a family-owned glass bottle recycling business, the company, now under Steve Marsden’s leadership, serves the industrial and commercial window glass industries. Specialising in recycling clear clean float, toughened glass, laminated, and mirrored glass, All Glass Recycling is committed to eco-friendly practices.

The Challenge

Driven by a commitment to sustainability and cost-effectiveness, All Glass Recycling sought to harness solar power for its operations. Partnering with Cyanergy, a leading solar solutions provider, the company aimed to implement a solar panel system at its Dandenong facility in Victoria.

Implementation Process

Cyanergy, renowned for sustainable energy solutions, seamlessly installed a cutting-edge solar panel system at All Glass Recycling’s Dandenong facility. The combination of JA Solar Panels and a Sungrow Inverter was tailored to meet energy needs efficiently, ensuring a reasonable payback period.

Results

Witness the transformation and benefits of All Glass Recycling’s solar initiative: 

Financial Gains: Achieve substantial savings with an investment recovery within 47 months.

Monthly Savings: Benefit from average monthly savings of $1,108.83.

Negative Yearly Bill: Experience a remarkable yearly bill reduction to -$106.00.

Environmentally Responsible: Reduce your carbon footprint with 100 MWh of clean energy annually.

Environmental Impact 

Discover how All Glass Recycling’s solar initiative aligns with environmental responsibility, positively impacting both the bottom line and the planet. The 73.7 kW solar system significantly reduces the company’s carbon footprint, strengthening our commitment to sustainable business practices.

Conclusion

Explore the success story of All Glass Recycling’s solar journey with Cyanergy. This case study exemplifies the potential for solar solutions to drive financial savings and environmental responsibility in the manufacturing sector. Embrace sustainable practices, boost your bottom line, and contribute to a greener future.

For more details on Cyanergy’s solar solutions, visit cyanergy.com.au.

Contact us today to learn more about how commercial solar can work for your business

Recent Projects

Animal Health

Animal Health When the Animal Emergency Center moved their office to East Melbourne, they realized that the lighting I the premises was not up to the standard. They called us

Read More »

Lilydale Service Group

KEY PROJECT INFORMATION CASE STUDY Lilydale Service Group Lilydale, VIC Download Case Study INVESTMENT $33,651.96 PAYBACK PERIOD 32 Months MONTHLY SAVINGS $887.50 SYSTEM SIZE 38.15kW GENERATION 53.973MWh YEARLY COST BEFORE

Read More »

Warehouse

Warehouse Energy bills can be a large overhead in business, especially in a warehouse as Toll. The client approaches us about their warehouse lighting upgrade to reduce their overall cost

Read More »

Fuel Stations

Fuel Stations Bright and clear canopy lighting increases a sense of safety and the comfort that can make the difference between “let’s drive on to the next one” to “let’s

Read More »
Scroll to Top