KEY PROJECT INFORMATION

CASE STUDY

Mitsubishi Motors
Dealership

Berwick, VIC 3806

Investment

INVESTMENT

$71,181.38

Payback period

PAYBACK 

29 Months

M / SAVINGS

$2,216.67

System size

SYSTEM SIZE

60kW

Generation

GENERATION

80.904MWh

YEARLY COST BEFORE SOLAR

$62,740.00

YEARLY COST AFTER SOLAR

$36,140.00

Berwick Mitsubishi

Mitsubishi Berwick, a distinguished automotive dealership dedicated to sustainability and environmental stewardship, embarked on a strategic initiative to align its green ethos by integrating renewable energy into its operations. Mitsubishi Berwick strategically partnered with Cyanergy, a premier commercial solar installation company. 

Following a meticulous evaluation of various solar providers, Cyanergy emerged as the optimal choice for Mitsubishi Berwick, offering unparalleled value and presenting a clear-cut proposal to streamline the entire process. This collaboration epitomises a professional synergy committed to advancing sustainable practices in the automotive industry. 

Investment Details

  • Investment: $71,181.38

  • Payback period: 29 months

  • Average Monthly Savings: $2,216.67

  • System Size: 59.4kW

  • Generation: 80.904MWh

Electricity Cost and Savings

  • Yearly Bill before solar: $62,740.00

  • Yearly Bill after solar: $36,140.00

Objective

In anticipation of a future dominated by electric cars, Mitsubishi Berwick aimed to reduce their electricity load and invest in a sustainable energy source capable of powering electric vehicles while minimising reliance on the grid.

Solution

Cyanergy implemented a 59.4kW solar PV system, featuring 108 JASolar panels and 2 Sungrow inverters. This solar solution is projected to generate 80.904MWh annually, providing a sustainable and efficient means to offset the electrical consumption of future electric vehicles.

Environmental Impact

Beyond substantial energy savings, the installed solar system will contribute to Mitsubishi Berwick’s commitment to environmental stewardship. The system is estimated to save Mitsubishi Berwick $22,621 annually and reduce carbon dioxide emissions by 126,402 kg per year. This emission reduction is equivalent to the impact of planting 2,090 seedlings for 10 years.

Cyanergy is proud to have played a crucial role in Mitsubishi Berwick’s transition to clean, renewable energy. This solar installation aligns with Mitsubishi’s commitment to sustainability and positions Mitsubishi Berwick as a forward-thinking leader in the automotive industry, ready to embrace the future of electric mobility.

Contact us today to learn more about how commercial solar can work for your business

Recent Projects

commercial solar project

Healey Factory Project

KEY PROJECT INFORMATION CASE STUDY The Healey Factory Mitcham, VIC 3132 Download Case Study INVESTMENT $56,035.00 PAYBACK PERIOD 35 Months SYSTEM SIZE 59.4 kW GENERATION 77.621MWh YEARLY COST BEFORE SOLAR

Read More »

Restaurant

Restaurant As we lead our way through LED technology, we slowly influenced different types of industries including the restaurants, Thus, we slowly transform how businesses see and think the importance

Read More »

Greenwood Business Park

Greenwood Business Park Working on big projects is not new to Cyanergy. We have had a handful of significant and relatively complicated jobs that we have successfully completed. One of

Read More »
Commercial Fronius Inverter

Tixana Pty Ltd

KEY PROJECT INFORMATION CASE STUDY Tixana Pty Ltd Campsie, NSW Download Case Study INVESTMENT $44,920.00 PAYBACK PERIOD 38 Months MONTHLY SAVINGS $907.50 SYSTEM SIZE 40.33 kW GENERATION 51MWh YEARLY COST

Read More »

Commercial Joinery Company

KEY PROJECT INFORMATION CASE STUDY Commercial Joinery Company Dandenong, VIC Download Case Study INVESTMENT $75,000.00 PAYBACK PERIOD 6 Years MONTHLY SAVINGS $1017.67 SYSTEM SIZE: 99.82 kW GENERATION 127.75 MWh YEARLY

Read More »
Scroll to Top