KEY PROJECT INFORMATION
INVESTMENT
$71,181.38
PAYBACK
29 Months
M / SAVINGS
$2,216.67
SYSTEM SIZE
60kW
GENERATION
80.904MWh
YEARLY COST BEFORE SOLAR
$62,740.00
YEARLY COST AFTER SOLAR
$36,140.00
Berwick Mitsubishi
Mitsubishi Berwick, a distinguished automotive dealership dedicated to sustainability and environmental stewardship, embarked on a strategic initiative to align its green ethos by integrating renewable energy into its operations. Mitsubishi Berwick strategically partnered with Cyanergy, a premier commercial solar installation company.
Following a meticulous evaluation of various solar providers, Cyanergy emerged as the optimal choice for Mitsubishi Berwick, offering unparalleled value and presenting a clear-cut proposal to streamline the entire process. This collaboration epitomises a professional synergy committed to advancing sustainable practices in the automotive industry.
Investment Details
Investment: $71,181.38
Payback period: 29 months
Average Monthly Savings: $2,216.67
System Size: 59.4kW
Generation: 80.904MWh
Electricity Cost and Savings
Yearly Bill before solar: $62,740.00
Yearly Bill after solar: $36,140.00
Objective
In anticipation of a future dominated by electric cars, Mitsubishi Berwick aimed to reduce their electricity load and invest in a sustainable energy source capable of powering electric vehicles while minimising reliance on the grid.
Solution
Cyanergy implemented a 59.4kW solar PV system, featuring 108 JASolar panels and 2 Sungrow inverters. This solar solution is projected to generate 80.904MWh annually, providing a sustainable and efficient means to offset the electrical consumption of future electric vehicles.
Environmental Impact
Beyond substantial energy savings, the installed solar system will contribute to Mitsubishi Berwick’s commitment to environmental stewardship. The system is estimated to save Mitsubishi Berwick $22,621 annually and reduce carbon dioxide emissions by 126,402 kg per year. This emission reduction is equivalent to the impact of planting 2,090 seedlings for 10 years.
Cyanergy is proud to have played a crucial role in Mitsubishi Berwick’s transition to clean, renewable energy. This solar installation aligns with Mitsubishi’s commitment to sustainability and positions Mitsubishi Berwick as a forward-thinking leader in the automotive industry, ready to embrace the future of electric mobility.
Contact us today to learn more about how commercial solar can work for your business
Recent Projects
New life Aquarium
KEY PROJECT INFORMATION CASE STUDY New life Aquarium Keysborough, VIC Download Case Study INVESTMENT $31,250.00 PAYBACK PERIOD 38 Months MONTHLY SAVINGS $743.33 SYSTEM SIZE 40.5 kW GENERATION 51MWh YEARLY COST
Uniplas Mouldings International | Commercial Solar Installation
Yearly energy cost before solar $647,005.00. Yearly energy cost after solar $456,097.00!
Wyndham Community Schools
KEY PROJECT INFORMATION CASE STUDY Wyndham Community Schools Werribee, VIC Download Case Study INVESTMENT $49,000.00 PAYBACK PERIOD 49 Months SYSTEM SIZE 54.25 kW GENERATION 69.9MWh Wyndham Community Schools The ChallengeMost
Greenwood Business Park
Greenwood Business Park Working on big projects is not new to Cyanergy. We have had a handful of significant and relatively complicated jobs that we have successfully completed. One of
Ram Locksmith Project
KEY PROJECT INFORMATION CASE STUDY Ram Locksmith Dandenong, VIC Download Case Study INVESTMENT $31,820.00 PAYBACK PERIOD 39 Months MONTHLY SAVINGS $715.00 SYSTEM SIZE 40kW GENERATION 53.96MWh YEARLY COST BEFORE SOLAR
Manufacturing
Manufacturing To remain strong in industry, we scrutinize costs across every process. Lighting can account for up to 80% of a manufacturing warehouse energy bill so it must be as