KEY PROJECT INFORMATION

INVESTMENT
$24,050

PAYBACK
26 Months

M / SAVINGS
$925

SYSTEM SIZE
39.6kW

GENERATION
47.32 MWh
YEARLY COST BEFORE SOLAR
YEARLY COST AFTER SOLAR
Creswick Tyrepower
Overview
Creswick Tyrepower, a leading automotive service provider, sought to reduce its electricity costs and improve sustainability through a tailored solar energy solution. With rising energy prices and a commitment to environmental responsibility, the business needed a reliable and cost-effective way to manage energy expenses.
Solution
To address their energy needs, we installed a 39.6kW solar system designed to optimise energy consumption and significantly cut electricity costs. The system was strategically sized to maximise efficiency and savings while ensuring long-term financial and environmental benefits.
Results
-
- Monthly Savings: $925
- Annual Savings: $11,100
- Return on Investment (ROI): 2 years and 2 months
- Energy Independence: Reduced reliance on grid electricity
- Sustainability: Significant reduction in carbon footprint
Impact
Why Tyrepower Locations Should Consider Solar
With high energy usage from lighting, equipment, and operations, Tyrepower locations can benefit greatly from a tailored solar installation. The success of Creswick Tyrepower demonstrates the financial and environmental advantages that solar energy can bring to automotive businesses.
If you’re interested in reducing your energy bills and improving sustainability, now is the perfect time to explore solar solutions for your Tyrepower location. Contact us today to discuss how we can help your business achieve similar savings and benefits.



Contact us today to learn more about how commercial solar can work for your business
Recent Projects

New life Aquarium
KEY PROJECT INFORMATION CASE STUDY New life Aquarium Keysborough, VIC Download Case Study INVESTMENT $31,250.00 PAYBACK PERIOD 38 Months MONTHLY SAVINGS $743.33 SYSTEM SIZE 40.5 kW GENERATION 51MWh YEARLY COST

Healey Factory Project
KEY PROJECT INFORMATION CASE STUDY The Healey Factory Mitcham, VIC 3132 Download Case Study INVESTMENT $56,035.00 PAYBACK PERIOD 35 Months SYSTEM SIZE 59.4 kW GENERATION 77.621MWh YEARLY COST BEFORE SOLAR

Wyndham Community Schools
KEY PROJECT INFORMATION CASE STUDY Wyndham Community Schools Werribee, VIC Download Case Study INVESTMENT $49,000.00 PAYBACK PERIOD 49 Months SYSTEM SIZE 54.25 kW GENERATION 69.9MWh Wyndham Community Schools The ChallengeMost

Warehouse
Warehouse Energy bills can be a large overhead in business, especially in a warehouse as Toll. The client approaches us about their warehouse lighting upgrade to reduce their overall cost

Fuel Stations
Fuel Stations Bright and clear canopy lighting increases a sense of safety and the comfort that can make the difference between “let’s drive on to the next one” to “let’s

Lilydale Service Group
KEY PROJECT INFORMATION CASE STUDY Lilydale Service Group Lilydale, VIC Download Case Study INVESTMENT $33,651.96 PAYBACK PERIOD 32 Months MONTHLY SAVINGS $887.50 SYSTEM SIZE 38.15kW GENERATION 53.973MWh YEARLY COST BEFORE