KEY PROJECT INFORMATION
Energy Independence
27% of daily energy consumption
ROI
31 Months
M / SAVINGS
$1,735 Approx
SYSTEM SIZE
78.88 kW
GENERATION
Snap Fitness Solar System: 78.88 kW
YEARLY COST BEFORE SOLAR - BRUNSWICK
YEARLY COST AFTER SOLAR
YEARLY COST BEFORE SOLAR - WERRIBEE
YEARLY COST AFTER SOLAR
Snap Fitness
Overview
Snap Fitness Glen Waverley is a high-energy facility with substantial daily electricity demand. Like many gyms, a large portion of their energy is used for lighting, air conditioning, and equipment, leading to high monthly electricity bills. Snap Fitness sought a solution to reduce operational costs, improve sustainability, and increase energy independence.
Solution
Cyanergy designed and installed a 78.88 kW solar system tailored to Snap Fitness’s energy usage. The system includes 136 Longi solar panels and 2 Sungrow inverters, optimised for maximum self-consumption and efficiency. Professional installation followed Australian Standards to ensure long-term performance and reliability.
Results
The solar installation has delivered significant financial and environmental benefits for Snap Fitness Glen Waverley:
- Monthly Savings: Approximately $1,735
- Annual Savings: $20,820
- Return on Investment (ROI): 2 years 7 months
- Energy Independence: 27% of daily energy consumption is now met directly from solar
- Sustainability: Reduction of 1,760 tonnes of CO₂ emissions over the system’s lifetime
Impact
By switching to solar, Snap Fitness Glen Waverley has reduced operational costs, increased energy reliability, and enhanced its sustainability credentials. This forward-thinking approach supports long-term financial and environmental goals while maintaining comfort and performance for members.
Why Gym Locations Should Consider Solar
Gyms typically have high energy consumption due to lighting, climate control, and equipment. Solar energy can:
- Significantly reduce electricity bills
- Provide predictable energy costs and faster ROI
- Support sustainability initiatives and enhance brand reputation
- Reduce reliance on the grid and increase energy independence
Contact us today to learn more about how commercial solar can work for your business
Recent Projects

Harrington Park, New South Wales
Vetland 24-Hour Animal Hospital in Mitcham, Victoria, Partners with Cyanergy for a Sustainable Future

Essendon, Victoria
Vetland 24-Hour Animal Hospital in Mitcham, Victoria, Partners with Cyanergy for a Sustainable Future

Yea, Victoria
Vetland 24-Hour Animal Hospital in Mitcham, Victoria, Partners with Cyanergy for a Sustainable Future

Greenwood Business Park
Greenwood Business Park Working on big projects is not new to Cyanergy. We have had a handful of significant and relatively complicated jobs that we have successfully completed. One of

Wyndham Community Schools
KEY PROJECT INFORMATION CASE STUDY Wyndham Community Schools Werribee, VIC Download Case Study INVESTMENT $49,000.00 PAYBACK PERIOD 49 Months SYSTEM SIZE 54.25 kW GENERATION 69.9MWh Wyndham Community Schools The ChallengeMost

Ram Locksmith Project
KEY PROJECT INFORMATION CASE STUDY Ram Locksmith Dandenong, VIC Download Case Study INVESTMENT $31,820.00 PAYBACK PERIOD 39 Months MONTHLY SAVINGS $715.00 SYSTEM SIZE 40kW GENERATION 53.96MWh YEARLY COST BEFORE SOLAR