KEY PROJECT INFORMATION
INVESTMENT
$108462.82
PAYBACK
63 Months
M / SAVINGS
$1,623.33
SYSTEM SIZE
99.88kW
GENERATION
141.09 MWh
YEARLY COST BEFORE SOLAR
YEARLY COST AFTER SOLAR
Kew Golf Club
Project Overview
Kew Golf Club, one of Victoria’s premier golfing destinations, was looking for a cost-effective solar energy solution to reduce its rising electricity costs and lower its carbon footprint. The club partnered with Cyanergy, a leader in commercial solar installations, to develop a customized solar power system tailored to their unique requirements. Glenn, Cyanergy’s expert commercial sales representative, worked closely with the club to ensure the solution aligned with their sustainability goals and financial objectives.
Key Project Details
- System Size: 99.88 kW
- Investment: $108,462.82
- Payback Period: 63 months
- Average Monthly Savings: $1,623.33
- Yearly Bill Before Solar: $52,330.00
- Yearly Bill After Solar: $26,165.00
- Annual Energy Generation: 141.09 MWh
Challenges and Solutions
One of the biggest challenges of this project was the club’s specialized roofing material, consisting of rubber tiles rarely seen in Australia. Glenn and the Cyanergy team took a proactive approach, sourcing a specialized fixing solution from the USA that was compatible with the rubber roof while ensuring full compliance with Australian structural standards. The installation was carefully reviewed and approved by engineers to guarantee safety and longevity.
Additionally, the club had strict requirements for aesthetic appeal. Understanding this need, Glenn and the team opted for Longi All-Black 440W solar panels, which offer a sleek and modern look, paired with a Sungrow 110kW inverter to maximize efficiency and performance.
Outcome
By switching to solar energy, Kew Golf Club has achieved significant financial and environmental benefits. With an annual savings of over $26,165, the club has reduced its electricity bills by 50% while producing clean energy.
This project demonstrates Cyanergy’s expertise in commercial solar power solutions, overcoming installation challenges while delivering a high-performing, visually appealing, and cost-saving solar system.
Thanks to Glenn’s commitment and the Cyanergy team’s innovation, Kew Golf Club is now a sustainable leader in the golf industry.
Contact us today to learn more about how commercial solar can work for your business
Recent Projects
School
School This LED upgrade for a primary school in McKinnon, Victoria is a well-thought decision. It was high time for the school to find a solution to their sky-high energy
Multi-Site Age Care Facility Project
KEY PROJECT INFORMATION CASE STUDY Age-Care Facility Project Mitcham, VIC Download Case Study INVESTMENT $60,000.00 PAYBACK PERIOD 52.8 months MONTHLY SAVINGS $1,193.25 SYSTEM SIZE: 60 kW GENERATION 80.652 MWh Age
Whites Glenola Hay Far | Commercial Solar Installation
Yearly energy cost before solar $8750.00. Yearly energy cost after solar $428.00
Greenwood Business Park
Greenwood Business Park Working on big projects is not new to Cyanergy. We have had a handful of significant and relatively complicated jobs that we have successfully completed. One of
Froliq Early Learning | 26.4kW Solar Installation
Kew Golf Club, one of Victoria’s premier golfing destinations, was looking for a cost-effective solar energy solution to reduce its rising electricity costs and lower its carbon footprint
All Glass Recycling | Commercial Solar Installation
Are you interested in how All Glass Recycling, a leading player in the recycling industry, achieved significant cost savings and environmental sustainability through solar energy? Read on to discover how Cyanergy’s solar panel solution transformed All Glass Recycling’s operations.