KEY PROJECT INFORMATION
INVESTMENT
$23,000
PAYBACK
52 Months
M / SAVINGS
$315.00
SYSTEM SIZE
18kW
GENERATION
22.904MWh
YEARLY COST BEFORE SOLAR
YEARLY COST AFTER SOLAR
The Bean Cartel
Roasting House
Project Overview:
The Bean Cartel, a renowned coffee roasting company based in Notting Hill, Victoria, made a strategic investment in solar energy to enhance sustainability efforts and reduce operational costs. With the assistance of Cyanergy, The Bean Cartel successfully installed a solar array comprising 41 JASolar panels on the roof of their warehouse.
System Configuration:
- 1 x Sungrow SG15RT inverter with a maximum AC output of 15.00 kW.
- The solar array includes 41 x JA Solar JAM54D40-440/LB/1500V panels with a maximum DC power of 18.04 kW.
Benefits and Impact:
The installation of solar panels at The Bean Cartel’s roastery house in Notting Hill marks a significant milestone in their commitment to sustainability. By harnessing solar energy, The Bean Cartel can effectively offset the equivalent of 20 households’ worth of annual energy consumption, based on an average daily usage of 25 kWh per household.
Environmental Contribution:
The adoption of solar power aligns with The Bean Cartel’s mission to contribute to the War on Waste and minimize environmental impact. Solar energy production generates electricity from sunlight, eliminating the need for fossil fuels and reducing greenhouse gas emissions. As a renewable energy source, solar power ensures sustainability and abundance, supporting The Bean Cartel’s commitment to environmental stewardship.
Conclusion:
The Bean Cartel’s investment in solar energy exemplifies their dedication to sustainable practices and responsible business operations. By partnering with Cyanergy and embracing solar technology, The Bean Cartel not only reduces operational costs but also demonstrates leadership in environmental conservation within the coffee roasting industry. As they continue to champion sustainability, The Bean Cartel sets a precedent for businesses seeking to make a positive impact on both the planet and their bottom line.
Contact us today to learn more about how commercial solar can work for your business
Recent Projects
Retail
Retail Initially, the retail store was not properly lighted. They were facing problems with safety and productivity. Plus the high power bill and high maintenance cost. These challenges made them
Residential Case-studies
Residential The owner partnered with us with a primary goal of reducing their power bill of more or less $850 a quarter and ever-recurring maintenance costs. Immediately, Cyanergy’s assessment offered
Ram Locksmith Project
KEY PROJECT INFORMATION CASE STUDY Ram Locksmith Dandenong, VIC Download Case Study INVESTMENT $31,820.00 PAYBACK PERIOD 39 Months MONTHLY SAVINGS $715.00 SYSTEM SIZE 40kW GENERATION 53.96MWh YEARLY COST BEFORE SOLAR
Wyndham Community Schools
KEY PROJECT INFORMATION CASE STUDY Wyndham Community Schools Werribee, VIC Download Case Study INVESTMENT $49,000.00 PAYBACK PERIOD 49 Months SYSTEM SIZE 54.25 kW GENERATION 69.9MWh Wyndham Community Schools The ChallengeMost
Whites Glenola Hay Far | Commercial Solar Installation
Yearly energy cost before solar $8750.00. Yearly energy cost after solar $428.00
All Glass Recycling | Commercial Solar Installation
Are you interested in how All Glass Recycling, a leading player in the recycling industry, achieved significant cost savings and environmental sustainability through solar energy? Read on to discover how Cyanergy’s solar panel solution transformed All Glass Recycling’s operations.