KEY PROJECT INFORMATION
INVESTMENT
$60,000.00
PAYBACK PERIOD
52.8 months
MONTHLY SAVINGS
$1,193.25
SYSTEM SIZE:
60 kW
GENERATION
80.652 MWh
Age Care Facility Project
Our customer sought a sustainable, high-quality, and affordable renewable energy solution that would help reduce operating costs. The Chief Operating Officer, was concerned about the potential impact on residents and maintaining service levels during such a complex rollout. 24-hours business operations, and health and safety and patient care obligations.
Cyanergy tailored the solar power systems to the roof spaces and electrical layouts of the Aged Care facility. In total, this comprised 132 solar panels covering a total area of 400 m2. Limiting disruption to daily operations over the two-stage rollout was managed in a flexible and cooperative manner. Our project management team maintained a high level of collaboration, communications, and policies and procedures were also modified to accommodate needs.
The 60 kW solar solutions have helped the Aged Care meet their goals for energy savings and sustainability. In total the systems are generating, on average, 210 kWh per day.Â
Contact us today to learn more about how commercial solar can work for your business
Recent Projects

Kew Golf Club | 99kW Commercial Solar Installation
Kew Golf Club, one of Victoria’s premier golfing destinations, was looking for a cost-effective solar energy solution to reduce its rising electricity costs and lower its carbon footprint

Sixt Car Rental | Commercial Solar Installation
Sixt Car Rental reached out to Cyanergy to explore options for reducing energy costs and enhancing sustainability.

All Glass Recycling | Commercial Solar Installation
Are you interested in how All Glass Recycling, a leading player in the recycling industry, achieved significant cost savings and environmental sustainability through solar energy? Read on to discover how Cyanergy’s solar panel solution transformed All Glass Recycling’s operations.

Philter Brewing | Commercial Solar Installation
KEY PROJECT INFORMATION CASE STUDY Philter Brewing Pty LTD Marrickville NSW 2204 Download Case Study INVESTMENT $82,227.75 PAYBACK 34 Months M / SAVINGS $2,427.00 SYSTEM SIZE 86kW GENERATION 119.99MWh YEARLY

Uniplas Mouldings International | Commercial Solar Installation
Yearly energy cost before solar $647,005.00. Yearly energy cost after solar $456,097.00!

Creswick Tyrepower | 39KW Solar Installation
Kew Golf Club, one of Victoria’s premier golfing destinations, was looking for a cost-effective solar energy solution to reduce its rising electricity costs and lower its carbon footprint


