KEY PROJECT INFORMATION

INVESTMENT
$44,920.00

PAYBACK PERIOD
38 Months

MONTHLY SAVINGS
$907.50

SYSTEM SIZE
40.33 kW

GENERATION
51MWh
YEARLY COST BEFORE SOLAR
YEARLY COST AFTER SOLAR

Tixana Pty LTD
In NSW, Tixana Pty LTD is an Australian-owned food production company that specializes in kosher, gluten-free, and halal snacks. We had the opportunity to collaborate with Tixana, and understand their energy needs, and to provide the right solution. The solution came in the form of a 40.33kW solar system.
With a capacity of 370W for each of its 109 solar panels, all of which are from the Tier-1 manufacturer Longi Solar, the facility now has the potential to generate 180kWh of power under ideal circumstances. Tixana produces about 139.824kWh of power with their 40kW solar system, which is unquestionably a fantastic result in NSW conditions. With their enormous food production demands, Tixana can now not only supply power for their facility, but also export some of it back to the grid.
A monitoring setup was also included with the solar installation. The setup is necessary since it gathers and shows real-time data on generation and consumption. The ability to further revamp energy practices and unearth efficiencies in the data is highly beneficial to the company.
After installation, they saved $586.15, or 52%, on their power cost, thanks to solar being a substantial power source for their production facilities. They have reportedly saved up to $10,961 so far from the date of installation.

Contact us today to learn more about how commercial solar can work for your business
Recent Projects

All Glass Recycling | Commercial Solar Installation
Are you interested in how All Glass Recycling, a leading player in the recycling industry, achieved significant cost savings and environmental sustainability through solar energy? Read on to discover how Cyanergy’s solar panel solution transformed All Glass Recycling’s operations.

Creswick Tyrepower | 39KW Solar Installation
Kew Golf Club, one of Victoria’s premier golfing destinations, was looking for a cost-effective solar energy solution to reduce its rising electricity costs and lower its carbon footprint

Wyndham Community Schools
KEY PROJECT INFORMATION CASE STUDY Wyndham Community Schools Werribee, VIC Download Case Study INVESTMENT $49,000.00 PAYBACK PERIOD 49 Months SYSTEM SIZE 54.25 kW GENERATION 69.9MWh Wyndham Community Schools The ChallengeMost

Manufacturing
Manufacturing To remain strong in industry, we scrutinize costs across every process. Lighting can account for up to 80% of a manufacturing warehouse energy bill so it must be as

Sixt Car Rental | Commercial Solar Installation
Sixt Car Rental reached out to Cyanergy to explore options for reducing energy costs and enhancing sustainability.

Retail
Retail Initially, the retail store was not properly lighted. They were facing problems with safety and productivity. Plus the high power bill and high maintenance cost. These challenges made them