commercial solar project

KEY PROJECT INFORMATION

CASE STUDY

The Healey Factory

Mitcham, VIC 3132

Investment

INVESTMENT

$56,035.00

Payback period

PAYBACK PERIOD

35 Months

System size

SYSTEM SIZE

59.4 kW

Generation

GENERATION

77.621MWh

commercial solar installations

YEARLY COST BEFORE SOLAR

$27,950.00

YEARLY COST AFTER SOLAR

$10,140.00

The Healey Factory Project

The Healey Factory has been in operation since the 1970s, and it has grown into a professional sales, service, parts, and restoration/accident repair facility. The Healey Factory staff is composed of 27 individuals who have a wealth of experience in racing, rallying, and car building.

The Healey Factory decided to invest in solar PV after being recommended to do so by previous clients. After investigating the financial return of solar PV, The Healey Factory found that it was still a worthwhile investment despite changes in the renewables sector.

The Challenge 

On average, auto dealerships consume more energy than a typical office building because of lighting and air conditioning and other workshop-related systems such as compressors and vehicle hoists.

The Solution

Cyanergy installed a 59.4kWp system was installed using high-quality smart PV panels and a 50kW inverter. Careful consideration was taken during the system’s design in order to avoid shading from the upper roof and cladding upstands.

commercial solar installations

Contact us today to learn more about how commercial solar can work for your business

Recent Projects

Sparacino Farms | Commercial Solar Installation

Sparacino Farms reaching out to Cyanergy to explore options for reducing energy costs and enhancing sustainability. Cyanergy’s team conducted a thorough assessment of the farm’s energy needs and financial goals, offering a tailored solar solution that included a 99.76 kW system for the farm and a separate 27.7 kW system with battery storage for the residential property.

Read More »

Ram Locksmith Project

KEY PROJECT INFORMATION CASE STUDY Ram Locksmith Dandenong, VIC Download Case Study INVESTMENT $31,820.00 PAYBACK PERIOD 39 Months MONTHLY SAVINGS $715.00 SYSTEM SIZE 40kW GENERATION 53.96MWh YEARLY COST BEFORE SOLAR

Read More »

The Bean Cartel | Commercial Solar Installation

The Bean Cartel, a renowned coffee roasting company based in Notting Hill, Victoria, made a strategic investment in solar energy to enhance sustainability efforts and reduce operational costs. With the assistance of Cyanergy, The Bean Cartel successfully installed a solar array comprising 41 JASolar panels on the roof of their warehouse.

Read More »

Manufacturing

Manufacturing To remain strong in industry, we scrutinize costs across every process. Lighting can account for up to 80% of a manufacturing warehouse energy bill so it must be as

Read More »
Scroll to Top