commercial solar project

KEY PROJECT INFORMATION

CASE STUDY

The Healey Factory

Mitcham, VIC 3132

Investment

INVESTMENT

$56,035.00

Payback period

PAYBACK PERIOD

35 Months

System size

SYSTEM SIZE

59.4 kW

Generation

GENERATION

77.621MWh

commercial solar installations

YEARLY COST BEFORE SOLAR

$27,950.00
YEARLY COST BEFORE SOLAR 28%

YEARLY COST AFTER SOLAR

$10,140.00
YEARLY COST AFTER SOLAR 11%

The Healey Factory Project

The Healey Factory has been in operation since the 1970s, and it has grown into a professional sales, service, parts, and restoration/accident repair facility. The Healey Factory staff is composed of 27 individuals who have a wealth of experience in racing, rallying, and car building.

The Healey Factory decided to invest in solar PV after being recommended to do so by previous clients. After investigating the financial return of solar PV, The Healey Factory found that it was still a worthwhile investment despite changes in the renewables sector.

The Challenge 

On average, auto dealerships consume more energy than a typical office building because of lighting and air conditioning and other workshop-related systems such as compressors and vehicle hoists.

The Solution

Cyanergy installed a 59.4kWp system was installed using high-quality smart PV panels and a 50kW inverter. Careful consideration was taken during the system’s design in order to avoid shading from the upper roof and cladding upstands.

commercial solar installations

Contact us today to learn more about how commercial solar can work for your business

Recent Projects

Commercial Joinery Company

KEY PROJECT INFORMATION CASE STUDY Commercial Joinery Company Dandenong, VIC Download Case Study INVESTMENT $75,000.00 PAYBACK PERIOD 6 Years MONTHLY SAVINGS $1017.67 SYSTEM SIZE: 99.82 kW GENERATION 127.75 MWh YEARLY

Read More »

Greenwood Business Park

Greenwood Business Park Working on big projects is not new to Cyanergy. We have had a handful of significant and relatively complicated jobs that we have successfully completed. One of

Read More »
commercial solar project

Healey Factory Project

KEY PROJECT INFORMATION CASE STUDY The Healey Factory Mitcham, VIC 3132 Download Case Study INVESTMENT $56,035.00 PAYBACK PERIOD 35 Months SYSTEM SIZE 59.4 kW GENERATION 77.621MWh YEARLY COST BEFORE SOLAR

Read More »

Manufacturing

Manufacturing To remain strong in industry, we scrutinize costs across every process. Lighting can account for up to 80% of a manufacturing warehouse energy bill so it must be as

Read More »
Scroll to Top