commercial solar project

KEY PROJECT INFORMATION

CASE STUDY

The Healey Factory

Mitcham, VIC 3132

Investment

INVESTMENT

$56,035.00

Payback period

PAYBACK PERIOD

35 Months

System size

SYSTEM SIZE

59.4 kW

Generation

GENERATION

77.621MWh

commercial solar installations

YEARLY COST BEFORE SOLAR

$27,950.00

YEARLY COST AFTER SOLAR

$10,140.00

The Healey Factory Project

The Healey Factory has been in operation since the 1970s, and it has grown into a professional sales, service, parts, and restoration/accident repair facility. The Healey Factory staff is composed of 27 individuals who have a wealth of experience in racing, rallying, and car building.

The Healey Factory decided to invest in solar PV after being recommended to do so by previous clients. After investigating the financial return of solar PV, The Healey Factory found that it was still a worthwhile investment despite changes in the renewables sector.

The Challenge 

On average, auto dealerships consume more energy than a typical office building because of lighting and air conditioning and other workshop-related systems such as compressors and vehicle hoists.

The Solution

Cyanergy installed a 59.4kWp system was installed using high-quality smart PV panels and a 50kW inverter. Careful consideration was taken during the system’s design in order to avoid shading from the upper roof and cladding upstands.

commercial solar installations

Contact us today to learn more about how commercial solar can work for your business

Recent Projects

Animal Health

Animal Health When the Animal Emergency Center moved their office to East Melbourne, they realized that the lighting I the premises was not up to the standard. They called us

Read More »
Commercial Fronius Inverter

Tixana Pty Ltd

KEY PROJECT INFORMATION CASE STUDY Tixana Pty Ltd Campsie, NSW Download Case Study INVESTMENT $44,920.00 PAYBACK PERIOD 38 Months MONTHLY SAVINGS $907.50 SYSTEM SIZE 40.33 kW GENERATION 51MWh YEARLY COST

Read More »

Specialized | Commercial Solar Installation

Specialized, a renowned name in the cycling industry, embarked on a strategic sustainability initiative by investing in solar energy at its manufacturing facility in Port Melbourne, Victoria. Partnering with Cyanergy, Specialized aimed to enhance its environmental stewardship while simultaneously reducing operational costs. The initiative involved the installation of a solar array on the facility’s roof, comprising cutting-edge solar panels

Read More »
Commercial solar systems

New life Aquarium

KEY PROJECT INFORMATION CASE STUDY New life Aquarium Keysborough, VIC Download Case Study INVESTMENT $31,250.00 PAYBACK PERIOD 38 Months MONTHLY SAVINGS $743.33 SYSTEM SIZE 40.5 kW GENERATION 51MWh YEARLY COST

Read More »
Scroll to Top