KEY PROJECT INFORMATION
INVESTMENT
$75,000.00
PAYBACK PERIOD
6 Years
MONTHLY SAVINGS
$1017.67
SYSTEM SIZE:
99.82 kW
GENERATION
127.75 MWh
YEARLY COST BEFORE SOLAR
YEARLY COST AFTER SOLAR
Commercial Joinery Company
Commercial Joinery Company was established in 2006 and is a specialist industry leader delivering joinery services to commercial clients.
With power bills around 30k per year, Commercial Joinery Company asked Cyanergy to propose a suitable commercial solar solution.
Installing a commercial solar system for your business is a straightforward decision. As with all business investment decisions, it is all about the Return On Investment (ROI). When proposing a commercial solar system for a business, Cyanergy examines the current power usage patterns and designs a system that suits their requirements.
Using an advanced satellite-based solar mapping software, Cyanergy maps the solar panels onto the roof. The software takes into account the location, panel model, panel tilt and orientation to produce a report that gives the estimated output of the system allowing us to calculate estimated yearly savings and payback time.
OUTCOME SUMMARY
- Reduction in cost of energy by almost half
- Business is protected against future electricity rate increases
- Increased value of the property
- Reduced carbon emissions
- Improved business cash flow
Contact us today to learn more about how commercial solar can work for your business
Recent Projects
Residential Case-studies
Residential The owner partnered with us with a primary goal of reducing their power bill of more or less $850 a quarter and ever-recurring maintenance costs. Immediately, Cyanergy’s assessment offered
Uniplas Mouldings International | Commercial Solar Installation
Yearly energy cost before solar $647,005.00. Yearly energy cost after solar $456,097.00!
Creswick Tyrepower | 39KW Solar Installation
Kew Golf Club, one of Victoria’s premier golfing destinations, was looking for a cost-effective solar energy solution to reduce its rising electricity costs and lower its carbon footprint
Ashfield Bowling Club | Commercial Solar Installation
Ashfield Bowling Club has invested $9,670 in a 32.56 kW solar system, generating 41.395 MWh annually. This initiative saves $805.83 monthly, with a payback period of 12 months, showcasing the club's commitment to sustainability and energy efficiency for its members and the community.
Philter Brewing | Commercial Solar Installation
KEY PROJECT INFORMATION CASE STUDY Philter Brewing Pty LTD Marrickville NSW 2204 Download Case Study INVESTMENT $82,227.75 PAYBACK 34 Months M / SAVINGS $2,427.00 SYSTEM SIZE 86kW GENERATION 119.99MWh YEARLY
Whites Glenola Hay Far | Commercial Solar Installation
Yearly energy cost before solar $8750.00. Yearly energy cost after solar $428.00