KEY PROJECT INFORMATION
INVESTMENT
$75,000.00
PAYBACK PERIOD
6 Years
MONTHLY SAVINGS
$1017.67
SYSTEM SIZE:
99.82 kW
GENERATION
127.75 MWh
YEARLY COST BEFORE SOLAR
YEARLY COST AFTER SOLAR
Commercial Joinery Company
Commercial Joinery Company was established in 2006 and is a specialist industry leader delivering joinery services to commercial clients.
With power bills around 30k per year, Commercial Joinery Company asked Cyanergy to propose a suitable commercial solar solution.
Installing a commercial solar system for your business is a straightforward decision. As with all business investment decisions, it is all about the Return On Investment (ROI). When proposing a commercial solar system for a business, Cyanergy examines the current power usage patterns and designs a system that suits their requirements.
Using an advanced satellite-based solar mapping software, Cyanergy maps the solar panels onto the roof. The software takes into account the location, panel model, panel tilt and orientation to produce a report that gives the estimated output of the system allowing us to calculate estimated yearly savings and payback time.
OUTCOME SUMMARY
- Reduction in cost of energy by almost half
- Business is protected against future electricity rate increases
- Increased value of the property
- Reduced carbon emissions
- Improved business cash flow
Contact us today to learn more about how commercial solar can work for your business
Recent Projects

New life Aquarium
KEY PROJECT INFORMATION CASE STUDY New life Aquarium Keysborough, VIC Download Case Study INVESTMENT $31,250.00 PAYBACK PERIOD 38 Months MONTHLY SAVINGS $743.33 SYSTEM SIZE 40.5 kW GENERATION 51MWh YEARLY COST

Ringwood North, Victoria
Vetland 24-Hour Animal Hospital in Mitcham, Victoria, Partners with Cyanergy for a Sustainable Future

Mount Eliza, Victoria
Vetland 24-Hour Animal Hospital in Mitcham, Victoria, Partners with Cyanergy for a Sustainable Future

Essendon, Victoria
Vetland 24-Hour Animal Hospital in Mitcham, Victoria, Partners with Cyanergy for a Sustainable Future

Healey Factory Project
KEY PROJECT INFORMATION CASE STUDY The Healey Factory Mitcham, VIC 3132 Download Case Study INVESTMENT $56,035.00 PAYBACK PERIOD 35 Months SYSTEM SIZE 59.4 kW GENERATION 77.621MWh YEARLY COST BEFORE SOLAR

All Glass Recycling | Commercial Solar Installation
Are you interested in how All Glass Recycling, a leading player in the recycling industry, achieved significant cost savings and environmental sustainability through solar energy? Read on to discover how Cyanergy’s solar panel solution transformed All Glass Recycling’s operations.


