KEY PROJECT INFORMATION
INVESTMENT
$56,035.00
PAYBACK PERIOD
35 Months
SYSTEM SIZE
59.4 kW
GENERATION
77.621MWh
YEARLY COST BEFORE SOLAR
$27,950.00
YEARLY COST AFTER SOLAR
$10,140.00
The Healey Factory Project
The Healey Factory has been in operation since the 1970s, and it has grown into a professional sales, service, parts, and restoration/accident repair facility. The Healey Factory staff is composed of 27 individuals who have a wealth of experience in racing, rallying, and car building.
The Healey Factory decided to invest in solar PV after being recommended to do so by previous clients. After investigating the financial return of solar PV, The Healey Factory found that it was still a worthwhile investment despite changes in the renewables sector.
The ChallengeÂ
On average, auto dealerships consume more energy than a typical office building because of lighting and air conditioning and other workshop-related systems such as compressors and vehicle hoists.
The Solution
Cyanergy installed a 59.4kWp system was installed using high-quality smart PV panels and a 50kW inverter. Careful consideration was taken during the system’s design in order to avoid shading from the upper roof and cladding upstands.
Contact us today to learn more about how commercial solar can work for your business
Recent Projects
Manufacturing
Manufacturing To remain strong in industry, we scrutinize costs across every process. Lighting can account for up to 80% of a manufacturing warehouse energy bill so it must be as
Greenwood Business Park
Greenwood Business Park Working on big projects is not new to Cyanergy. We have had a handful of significant and relatively complicated jobs that we have successfully completed. One of
Tixana Pty Ltd
KEY PROJECT INFORMATION CASE STUDY Tixana Pty Ltd Campsie, NSW Download Case Study INVESTMENT $44,920.00 PAYBACK PERIOD 38 Months MONTHLY SAVINGS $907.50 SYSTEM SIZE 40.33 kW GENERATION 51MWh YEARLY COST
AC Laser | Commercial Solar Installation
A leading manufacturer based in Thomastown, Victoria, turned to Cyanergy to meet their solar energy needs. To reduce their escalating energy costs and increase sustainability, AC Laser invested $90,600 in a 99.45 kW solar system that generates 141.75 MWh annually.
Lilydale Service Group
KEY PROJECT INFORMATION CASE STUDY Lilydale Service Group Lilydale, VIC Download Case Study INVESTMENT $33,651.96 PAYBACK PERIOD 32 Months MONTHLY SAVINGS $887.50 SYSTEM SIZE 38.15kW GENERATION 53.973MWh YEARLY COST BEFORE
Sixt Car Rental | Commercial Solar Installation
Sixt Car Rental reached out to Cyanergy to explore options for reducing energy costs and enhancing sustainability.