KEY PROJECT INFORMATION

INVESTMENT
$56,035.00

PAYBACK PERIOD
35 Months

SYSTEM SIZE
59.4 kW

GENERATION
77.621MWh

YEARLY COST BEFORE SOLAR
YEARLY COST AFTER SOLAR
The Healey Factory Project
The Healey Factory has been in operation since the 1970s, and it has grown into a professional sales, service, parts, and restoration/accident repair facility. The Healey Factory staff is composed of 27 individuals who have a wealth of experience in racing, rallying, and car building.
The Healey Factory decided to invest in solar PV after being recommended to do so by previous clients. After investigating the financial return of solar PV, The Healey Factory found that it was still a worthwhile investment despite changes in the renewables sector.
The ChallengeÂ
On average, auto dealerships consume more energy than a typical office building because of lighting and air conditioning and other workshop-related systems such as compressors and vehicle hoists.
The Solution
Cyanergy installed a 59.4kWp system was installed using high-quality smart PV panels and a 50kW inverter. Careful consideration was taken during the system’s design in order to avoid shading from the upper roof and cladding upstands.


Contact us today to learn more about how commercial solar can work for your business
Recent Projects

School
School This LED upgrade for a primary school in McKinnon, Victoria is a well-thought decision. It was high time for the school to find a solution to their sky-high energy

Lilydale Service Group
KEY PROJECT INFORMATION CASE STUDY Lilydale Service Group Lilydale, VIC Download Case Study INVESTMENT $33,651.96 PAYBACK PERIOD 32 Months MONTHLY SAVINGS $887.50 SYSTEM SIZE 38.15kW GENERATION 53.973MWh YEARLY COST BEFORE

Creswick Tyrepower | 39KW Solar Installation
Kew Golf Club, one of Victoria’s premier golfing destinations, was looking for a cost-effective solar energy solution to reduce its rising electricity costs and lower its carbon footprint

VetLand Mitcham | Commercial Solar Installation
Vetland 24-Hour Animal Hospital in Mitcham, Victoria, Partners with Cyanergy for a Sustainable Future

Multi-Site Age Care Facility Project
KEY PROJECT INFORMATION CASE STUDY Age-Care Facility Project Mitcham, VIC Download Case Study INVESTMENT $60,000.00 PAYBACK PERIOD 52.8 months MONTHLY SAVINGS $1,193.25 SYSTEM SIZE: 60 kW GENERATION 80.652 MWh Age

Froliq Early Learning | 26.4kW Solar Installation
Kew Golf Club, one of Victoria’s premier golfing destinations, was looking for a cost-effective solar energy solution to reduce its rising electricity costs and lower its carbon footprint