KEY PROJECT INFORMATION
INVESTMENT
$56,035.00
PAYBACK PERIOD
35 Months
SYSTEM SIZE
59.4 kW
GENERATION
77.621MWh
YEARLY COST BEFORE SOLAR
$27,950.00
YEARLY COST AFTER SOLAR
$10,140.00
The Healey Factory Project
The Healey Factory has been in operation since the 1970s, and it has grown into a professional sales, service, parts, and restoration/accident repair facility. The Healey Factory staff is composed of 27 individuals who have a wealth of experience in racing, rallying, and car building.
The Healey Factory decided to invest in solar PV after being recommended to do so by previous clients. After investigating the financial return of solar PV, The Healey Factory found that it was still a worthwhile investment despite changes in the renewables sector.
The ChallengeÂ
On average, auto dealerships consume more energy than a typical office building because of lighting and air conditioning and other workshop-related systems such as compressors and vehicle hoists.
The Solution
Cyanergy installed a 59.4kWp system was installed using high-quality smart PV panels and a 50kW inverter. Careful consideration was taken during the system’s design in order to avoid shading from the upper roof and cladding upstands.
Contact us today to learn more about how commercial solar can work for your business
Recent Projects
School
School This LED upgrade for a primary school in McKinnon, Victoria is a well-thought decision. It was high time for the school to find a solution to their sky-high energy
New life Aquarium
KEY PROJECT INFORMATION CASE STUDY New life Aquarium Keysborough, VIC Download Case Study INVESTMENT $31,250.00 PAYBACK PERIOD 38 Months MONTHLY SAVINGS $743.33 SYSTEM SIZE 40.5 kW GENERATION 51MWh YEARLY COST
Ram Locksmith Project
KEY PROJECT INFORMATION CASE STUDY Ram Locksmith Dandenong, VIC Download Case Study INVESTMENT $31,820.00 PAYBACK PERIOD 39 Months MONTHLY SAVINGS $715.00 SYSTEM SIZE 40kW GENERATION 53.96MWh YEARLY COST BEFORE SOLAR
Commercial Joinery Company
KEY PROJECT INFORMATION CASE STUDY Commercial Joinery Company Dandenong, VIC Download Case Study INVESTMENT $75,000.00 PAYBACK PERIOD 6 Years MONTHLY SAVINGS $1017.67 SYSTEM SIZE: 99.82 kW GENERATION 127.75 MWh YEARLY
Sparacino Farms | Commercial Solar Installation
Sparacino Farms reaching out to Cyanergy to explore options for reducing energy costs and enhancing sustainability. Cyanergy’s team conducted a thorough assessment of the farm’s energy needs and financial goals, offering a tailored solar solution that included a 99.76 kW system for the farm and a separate 27.7 kW system with battery storage for the residential property.
Uniplas Mouldings International | Commercial Solar Installation
Yearly energy cost before solar $647,005.00. Yearly energy cost after solar $456,097.00!