KEY PROJECT INFORMATION

INVESTMENT
$56,035.00

PAYBACK PERIOD
35 Months

SYSTEM SIZE
59.4 kW

GENERATION
77.621MWh

YEARLY COST BEFORE SOLAR
YEARLY COST AFTER SOLAR
The Healey Factory Project
The Healey Factory has been in operation since the 1970s, and it has grown into a professional sales, service, parts, and restoration/accident repair facility. The Healey Factory staff is composed of 27 individuals who have a wealth of experience in racing, rallying, and car building.
The Healey Factory decided to invest in solar PV after being recommended to do so by previous clients. After investigating the financial return of solar PV, The Healey Factory found that it was still a worthwhile investment despite changes in the renewables sector.
The ChallengeÂ
On average, auto dealerships consume more energy than a typical office building because of lighting and air conditioning and other workshop-related systems such as compressors and vehicle hoists.
The Solution
Cyanergy installed a 59.4kWp system was installed using high-quality smart PV panels and a 50kW inverter. Careful consideration was taken during the system’s design in order to avoid shading from the upper roof and cladding upstands.


Contact us today to learn more about how commercial solar can work for your business
Recent Projects

Shine Apartments | Commercial Solar Installation
KEY PROJECT INFORMATION CASE STUDY Shine Apartments Campsie, NSW 2204 Download Case Study INVESTMENT $38,294.00 PAYBACKÂ 37 Months M / SAVINGS $910.00 SYSTEM SIZE 39.6kW GENERATION 54.65MWh YEARLY COST BEFORE

VetLand Mitcham | Commercial Solar Installation
Vetland 24-Hour Animal Hospital in Mitcham, Victoria, Partners with Cyanergy for a Sustainable Future

Manufacturing
Manufacturing To remain strong in industry, we scrutinize costs across every process. Lighting can account for up to 80% of a manufacturing warehouse energy bill so it must be as

Tixana Pty Ltd
KEY PROJECT INFORMATION CASE STUDY Tixana Pty Ltd Campsie, NSW Download Case Study INVESTMENT $44,920.00 PAYBACK PERIOD 38 Months MONTHLY SAVINGS $907.50 SYSTEM SIZE 40.33 kW GENERATION 51MWh YEARLY COST

School
School This LED upgrade for a primary school in McKinnon, Victoria is a well-thought decision. It was high time for the school to find a solution to their sky-high energy

AC Laser | Commercial Solar Installation
A leading manufacturer based in Thomastown, Victoria, turned to Cyanergy to meet their solar energy needs. To reduce their escalating energy costs and increase sustainability, AC Laser invested $90,600 in a 99.45 kW solar system that generates 141.75 MWh annually.