KEY PROJECT INFORMATION
INVESTMENT
$56,035.00
PAYBACK PERIOD
35 Months
SYSTEM SIZE
59.4 kW
GENERATION
77.621MWh
YEARLY COST BEFORE SOLAR
YEARLY COST AFTER SOLAR
The Healey Factory Project
The Healey Factory has been in operation since the 1970s, and it has grown into a professional sales, service, parts, and restoration/accident repair facility. The Healey Factory staff is composed of 27 individuals who have a wealth of experience in racing, rallying, and car building.
The Healey Factory decided to invest in solar PV after being recommended to do so by previous clients. After investigating the financial return of solar PV, The Healey Factory found that it was still a worthwhile investment despite changes in the renewables sector.
The Challenge
On average, auto dealerships consume more energy than a typical office building because of lighting and air conditioning and other workshop-related systems such as compressors and vehicle hoists.
The Solution
Cyanergy installed a 59.4kWp system was installed using high-quality smart PV panels and a 50kW inverter. Careful consideration was taken during the system’s design in order to avoid shading from the upper roof and cladding upstands.
Contact us today to learn more about how commercial solar can work for your business
Recent Projects
Commercial Joinery Company
KEY PROJECT INFORMATION CASE STUDY Commercial Joinery Company Dandenong, VIC Download Case Study INVESTMENT $75,000.00 PAYBACK PERIOD 6 Years MONTHLY SAVINGS $1017.67 SYSTEM SIZE: 99.82 kW GENERATION 127.75 MWh YEARLY
Creswick Tyrepower | 39KW Solar Installation
Kew Golf Club, one of Victoria’s premier golfing destinations, was looking for a cost-effective solar energy solution to reduce its rising electricity costs and lower its carbon footprint
School
School This LED upgrade for a primary school in McKinnon, Victoria is a well-thought decision. It was high time for the school to find a solution to their sky-high energy
Kew Golf Club | 99kW Commercial Solar Installation
Kew Golf Club, one of Victoria’s premier golfing destinations, was looking for a cost-effective solar energy solution to reduce its rising electricity costs and lower its carbon footprint
Sixt Car Rental | Commercial Solar Installation
Sixt Car Rental reached out to Cyanergy to explore options for reducing energy costs and enhancing sustainability.
Wyndham Community Schools
KEY PROJECT INFORMATION CASE STUDY Wyndham Community Schools Werribee, VIC Download Case Study INVESTMENT $49,000.00 PAYBACK PERIOD 49 Months SYSTEM SIZE 54.25 kW GENERATION 69.9MWh Wyndham Community Schools The ChallengeMost