KEY PROJECT INFORMATION
INVESTMENT
$56,035.00
PAYBACK PERIOD
35 Months
SYSTEM SIZE
59.4 kW
GENERATION
77.621MWh
YEARLY COST BEFORE SOLAR
YEARLY COST AFTER SOLAR
The Healey Factory Project
The Healey Factory has been in operation since the 1970s, and it has grown into a professional sales, service, parts, and restoration/accident repair facility. The Healey Factory staff is composed of 27 individuals who have a wealth of experience in racing, rallying, and car building.
The Healey Factory decided to invest in solar PV after being recommended to do so by previous clients. After investigating the financial return of solar PV, The Healey Factory found that it was still a worthwhile investment despite changes in the renewables sector.
The Challenge
On average, auto dealerships consume more energy than a typical office building because of lighting and air conditioning and other workshop-related systems such as compressors and vehicle hoists.
The Solution
Cyanergy installed a 59.4kWp system was installed using high-quality smart PV panels and a 50kW inverter. Careful consideration was taken during the system’s design in order to avoid shading from the upper roof and cladding upstands.
Contact us today to learn more about how commercial solar can work for your business
Recent Projects

Ashfield Bowling Club | Commercial Solar Installation
Ashfield Bowling Club has invested $9,670 in a 32.56 kW solar system, generating 41.395 MWh annually. This initiative saves $805.83 monthly, with a payback period of 12 months, showcasing the club's commitment to sustainability and energy efficiency for its members and the community.

Berwick Mitsubishi | Commercial Solar Installation
Mitsubishi Berwick, a distinguished automotive dealership dedicated to sustainability and environmental stewardship, embarked on a strategic initiative to align its green ethos by integrating renewable energy into its operations. Mitsubishi Berwick strategically partnered with Cyanergy, a premier commercial solar installation company.

Commercial Joinery Company
KEY PROJECT INFORMATION CASE STUDY Commercial Joinery Company Dandenong, VIC Download Case Study INVESTMENT $75,000.00 PAYBACK PERIOD 6 Years MONTHLY SAVINGS $1017.67 SYSTEM SIZE: 99.82 kW GENERATION 127.75 MWh YEARLY

Fuel Stations
Fuel Stations Bright and clear canopy lighting increases a sense of safety and the comfort that can make the difference between “let’s drive on to the next one” to “let’s

Residential Case-studies
Residential The owner partnered with us with a primary goal of reducing their power bill of more or less $850 a quarter and ever-recurring maintenance costs. Immediately, Cyanergy’s assessment offered

Philter Brewing | Commercial Solar Installation
KEY PROJECT INFORMATION CASE STUDY Philter Brewing Pty LTD Marrickville NSW 2204 Download Case Study INVESTMENT $82,227.75 PAYBACK 34 Months M / SAVINGS $2,427.00 SYSTEM SIZE 86kW GENERATION 119.99MWh YEARLY