KEY PROJECT INFORMATION
INVESTMENT
$31,820.00
PAYBACK PERIOD
39 Months
MONTHLY SAVINGS
$715.00
SYSTEM SIZE
40kW
GENERATION
53.96MWh
YEARLY COST BEFORE SOLAR
YEARLY COST AFTER SOLAR
Ram Locksmith
This case study showcases how our team efficiently installed a 40 kW solar panel system at Ram Locksmith’s facility, resulting in substantial savings and a significant reduction in their carbon footprint. Let’s delve into the details of this project, demonstrating the long-term benefits of investing in solar energy.
Investment and Payback Period
Ram Locksmith made a smart investment of $31,000.00 in their solar panel system, provided by Cyanergy. The payback period for this project was an impressive 39 months, showcasing the financial viability of their decision. By choosing solar energy, Ram Locksmith not only achieved energy independence but also gained long-term cost savings.
Monthly and Yearly Savings
With the installation of the 40 kW solar panel system, Ram Locksmith experienced remarkable monthly and yearly savings. On average, they now save $715 per month on their energy bills. This amounts to a substantial annual savings of $8,580.00, which can be reinvested into their business or allocated for other operational needs. The reduced energy expenditure directly contributes to Ram Locksmith’s bottom line, improving its financial sustainability.
Energy Generation
The solar panel system installed by Cyanergy at Ram Locksmith’s premises generates an impressive 53.69 MWh (megawatt-hours) of clean, renewable energy annually. This significant energy generation enables Ram Locksmith to rely less on traditional grid electricity and decreases their reliance on fossil fuel-based energy sources. By embracing solar power, Ram Locksmith is actively participating in the transition to a more sustainable and eco-friendly energy future.
Yearly Bill Comparison
Prior to the installation, Ram Locksmith’s yearly energy bill amounted to $10,480.00. However, after the solar panel system was operational, their yearly bill was reduced dramatically to only $1,990.00. This considerable reduction in their energy expenses demonstrates the substantial financial advantage that solar energy offers to businesses. Ram Locksmith can now allocate the saved funds to other critical areas of their operation, such as equipment upgrades or employee development.
Efficient Installation
Cyanergy’s installation team, led by project manager Benson, completed the installation of Ram Locksmith’s 40 kW solar panel system in just 6 days. Our skilled technicians worked diligently to ensure a seamless installation process, adhering to the highest industry standards. The expertise of our team, coupled with efficient project management, allowed Ram Locksmith to swiftly transition to solar power and start reaping the benefits.
Contact us today to learn more about how commercial solar can work for your business
Recent Projects
Specialized | Commercial Solar Installation
Specialized, a renowned name in the cycling industry, embarked on a strategic sustainability initiative by investing in solar energy at its manufacturing facility in Port Melbourne, Victoria. Partnering with Cyanergy, Specialized aimed to enhance its environmental stewardship while simultaneously reducing operational costs. The initiative involved the installation of a solar array on the facility’s roof, comprising cutting-edge solar panels
Residential Case-studies
Residential The owner partnered with us with a primary goal of reducing their power bill of more or less $850 a quarter and ever-recurring maintenance costs. Immediately, Cyanergy’s assessment offered
Ashfield Bowling Club | Commercial Solar Installation
Ashfield Bowling Club has invested $9,670 in a 32.56 kW solar system, generating 41.395 MWh annually. This initiative saves $805.83 monthly, with a payback period of 12 months, showcasing the club's commitment to sustainability and energy efficiency for its members and the community.
Wyndham Community Schools
KEY PROJECT INFORMATION CASE STUDY Wyndham Community Schools Werribee, VIC Download Case Study INVESTMENT $49,000.00 PAYBACK PERIOD 49 Months SYSTEM SIZE 54.25 kW GENERATION 69.9MWh Wyndham Community Schools The ChallengeMost
Manufacturing
Manufacturing To remain strong in industry, we scrutinize costs across every process. Lighting can account for up to 80% of a manufacturing warehouse energy bill so it must be as
Kew Golf Club | 99kW Commercial Solar Installation
Kew Golf Club, one of Victoria’s premier golfing destinations, was looking for a cost-effective solar energy solution to reduce its rising electricity costs and lower its carbon footprint