KEY PROJECT INFORMATION
INVESTMENT
$591,823.71
PAYBACKÂ
37 Months
M / SAVINGS
$15,909.00
SYSTEM SIZE
490kW
GENERATION
752 MWh
YEARLY COST BEFORE SOLAR
$647,005.00
YEARLY COST AFTER SOLAR
$456,097.00
Uniplas Mouldings International
Over the past three years, Matthew of Cyanergy has collaborated closely with Uniplas on a range of energy-saving products. As part of their partnership, Matt diligently assessed their power costs annually and conducted comprehensive feasibility studies for their facility.
In light of the significant increase in energy expenses over the past two years, they identified a remarkable opportunity for a large-scale solar installation. What makes this opportunity even more enticing is the remarkable reduction in the payback period. Initially estimated at 6-7 years, the payback period has been dramatically shortened to just 3 years, thanks to the favourable trends in energy costs.
To further maximize the benefits, the installation has been strategically divided into multiple stages. This innovative approach has enabled Uniplas to access three distinct sets of subsidies, resulting in a substantial upfront cost reduction of over $190,000.00. Moreover, the efficiency and speed at which the project progressed are truly noteworthy. From the initial consultation to the completion of stage 1, which entailed installing 200kW of solar power, a mere four weeks had elapsed, to the final stage, where a combined total of 490kW was installed to complete the project.Â
This impressive turnaround time showcases the commitment and expertise of Cyanergy’s team in swiftly implementing sustainable energy solutions.Â
Matt’s collaboration with Uniplas exemplifies the power of Cyanergy and proactive engagement in driving tangible outcomes. Our shared focus on energy efficiency has not only brought financial advantages to Uniplas but also fostered a greener and more sustainable future.
Upgrade your commercial refrigerated display cabinet
to save between $800 - $900 per year in energy savings as part of the NSW energy saving scheme.
Contact us today to learn more about how commercial solar can work for your business
Recent Projects
Ashfield Bowling Club | Commercial Solar Installation
Ashfield Bowling Club has invested $9,670 in a 32.56 kW solar system, generating 41.395 MWh annually. This initiative saves $805.83 monthly, with a payback period of 12 months, showcasing the club's commitment to sustainability and energy efficiency for its members and the community.
Shine Apartments | Commercial Solar Installation
KEY PROJECT INFORMATION CASE STUDY Shine Apartments Campsie, NSW 2204 Download Case Study INVESTMENT $38,294.00 PAYBACKÂ 37 Months M / SAVINGS $910.00 SYSTEM SIZE 39.6kW GENERATION 54.65MWh YEARLY COST BEFORE
Manufacturing
Manufacturing To remain strong in industry, we scrutinize costs across every process. Lighting can account for up to 80% of a manufacturing warehouse energy bill so it must be as
School
School This LED upgrade for a primary school in McKinnon, Victoria is a well-thought decision. It was high time for the school to find a solution to their sky-high energy
Multi-Site Age Care Facility Project
KEY PROJECT INFORMATION CASE STUDY Age-Care Facility Project Mitcham, VIC Download Case Study INVESTMENT $60,000.00 PAYBACK PERIOD 52.8 months MONTHLY SAVINGS $1,193.25 SYSTEM SIZE: 60 kW GENERATION 80.652 MWh Age
Specialized | Commercial Solar Installation
Specialized, a renowned name in the cycling industry, embarked on a strategic sustainability initiative by investing in solar energy at its manufacturing facility in Port Melbourne, Victoria. Partnering with Cyanergy, Specialized aimed to enhance its environmental stewardship while simultaneously reducing operational costs. The initiative involved the installation of a solar array on the facility’s roof, comprising cutting-edge solar panels