KEY PROJECT INFORMATION

CASE STUDY

Uniplas

Wetherill Park, NSW 2204

Investment

INVESTMENT

$591,823.71

Payback period

PAYBACK 

37 Months

M / SAVINGS

$15,909.00

System size

SYSTEM SIZE

490kW

Generation

GENERATION

752 MWh

YEARLY COST BEFORE SOLAR

$647,005.00
YEARLY COST BEFORE SOLAR 75%

YEARLY COST AFTER SOLAR

$456,097.00
YEARLY COST AFTER SOLAR 55%

Uniplas Mouldings International

Over the past three years, Matthew of Cyanergy has collaborated closely with Uniplas on a range of energy-saving products. As part of their partnership, Matt diligently assessed their power costs annually and conducted comprehensive feasibility studies for their facility.
In light of the significant increase in energy expenses over the past two years, they identified a remarkable opportunity for a large-scale solar installation. What makes this opportunity even more enticing is the remarkable reduction in the payback period. Initially estimated at 6-7 years, the payback period has been dramatically shortened to just 3 years, thanks to the favourable trends in energy costs.
To further maximize the benefits, the installation has been strategically divided into multiple stages. This innovative approach has enabled Uniplas to access three distinct sets of subsidies, resulting in a substantial upfront cost reduction of over $190,000.00. Moreover, the efficiency and speed at which the project progressed are truly noteworthy. From the initial consultation to the completion of stage 1, which entailed installing 200kW of solar power, a mere four weeks had elapsed, to the final stage, where a combined total of 490kW was installed to complete the project. 
This impressive turnaround time showcases the commitment and expertise of Cyanergy’s team in swiftly implementing sustainable energy solutions. 
Matt’s collaboration with Uniplas exemplifies the power of Cyanergy and proactive engagement in driving tangible outcomes. Our shared focus on energy efficiency has not only brought financial advantages to Uniplas but also fostered a greener and more sustainable future.

Upgrade your commercial refrigerated display cabinet
to save between $800 - $900 per year in energy savings as part of the NSW energy saving scheme.

Contact us today to learn more about how commercial solar can work for your business

Recent Projects

Animal Health

Animal Health When the Animal Emergency Center moved their office to East Melbourne, they realized that the lighting I the premises was not up to the standard. They called us

Read More »

Ram Locksmith Project

KEY PROJECT INFORMATION CASE STUDY Ram Locksmith Dandenong, VIC Download Case Study INVESTMENT $31,820.00 PAYBACK PERIOD 39 Months MONTHLY SAVINGS $715.00 SYSTEM SIZE 40kW GENERATION 53.96MWh YEARLY COST BEFORE SOLAR

Read More »

Ashfield Bowling Club | Commercial Solar Installation

Ashfield Bowling Club has invested $9,670 in a 32.56 kW solar system, generating 41.395 MWh annually. This initiative saves $805.83 monthly, with a payback period of 12 months, showcasing the club's commitment to sustainability and energy efficiency for its members and the community.

Read More »

Commercial Joinery Company

KEY PROJECT INFORMATION CASE STUDY Commercial Joinery Company Dandenong, VIC Download Case Study INVESTMENT $75,000.00 PAYBACK PERIOD 6 Years MONTHLY SAVINGS $1017.67 SYSTEM SIZE: 99.82 kW GENERATION 127.75 MWh YEARLY

Read More »

Restaurant

Restaurant As we lead our way through LED technology, we slowly influenced different types of industries including the restaurants, Thus, we slowly transform how businesses see and think the importance

Read More »

Greenwood Business Park

Greenwood Business Park Working on big projects is not new to Cyanergy. We have had a handful of significant and relatively complicated jobs that we have successfully completed. One of

Read More »
Scroll to Top