KEY PROJECT INFORMATION
INVESTMENT
$92,868.00
PAYBACK
58 Months
M / SAVINGS
$693.50
SYSTEM SIZE
32.8kW
GENERATION
55.98 MWh
YEARLY COST BEFORE SOLAR
$8,750.00
YEARLY COST AFTER SOLAR
$428.00
Whites Glenola Pty LTD
White Glenola Pty Ltd engaged Cynergy to install a 32.9 kW solar system with Longi panels, AlphaESS Smile5 Inverters, and AlphaESS Batteries. Additionally, the scope involved upgrading 92 outdated metal halide and mercury vapor lights to energy-efficient LED Highbay Lights and installing 26 LED Floodlights.
.Project Implementation:
The project’s implementation was a carefully orchestrated process aimed at achieving maximum efficiency and benefits:
An extensive site assessment was conducted by Cynergy’s team of experts. This assessment analyzed the farm’s energy requirements, geographical location, and available resources. It served as the foundation for designing a bespoke solar solution that would cater to White Glenola Pty Ltd’s specific needs.
Following the site assessment, the installation of the 32.9 kW Longi solar panels began. These panels were strategically placed to capture the maximum amount of sunlight, optimizing energy production. They effectively converted sunlight into DC power, setting the stage for the subsequent energy transformation process. The AlphaESS Smile5 Inverters were seamlessly integrated into the solar system. The AlphaESS Batteries, with a capacity of 53.2 kWh, were connected to the system. These batteries were instrumental in storing surplus energy generated during the day, ensuring a constant power supply during periods of reduced sunlight or grid interruptions. This bolstered the farm’s energy independence and resilience.
Benefits Achieved:
Energy Savings: The installation of the solar system, along with the energy-efficient LED lighting, significantly reduced the farm’s reliance on grid electricity. This led to substantial cost savings on energy bills, a welcome financial benefit.
Energy Independence: The integration of AlphaESS Batteries ensured that the farm could store surplus energy. This not only reduced reliance on the grid but also provided a stable power supply even during overcast days or grid failures, enhancing energy self-sufficiency.
Environmental Impact: The shift towards solar energy and LED lighting contributed to a reduced carbon footprint. The farm’s adoption of cleaner and more efficient technologies was aligned with sustainable environmental practices.
Improved Operations: The upgraded lighting systems, consisting of LED Highbay Lights and Floodlights, had a transformative impact on farm operations. The improved visibility and security enhanced the overall efficiency of daily tasks and contributed to a safer work environment.
Contact us today to learn more about how commercial solar can work for your business
Recent Projects
The Bean Cartel | Commercial Solar Installation
The Bean Cartel, a renowned coffee roasting company based in Notting Hill, Victoria, made a strategic investment in solar energy to enhance sustainability efforts and reduce operational costs. With the assistance of Cyanergy, The Bean Cartel successfully installed a solar array comprising 41 JASolar panels on the roof of their warehouse.
Fuel Stations
Fuel Stations Bright and clear canopy lighting increases a sense of safety and the comfort that can make the difference between “let’s drive on to the next one” to “let’s
Ram Locksmith Project
KEY PROJECT INFORMATION CASE STUDY Ram Locksmith Dandenong, VIC Download Case Study INVESTMENT $31,820.00 PAYBACK PERIOD 39 Months MONTHLY SAVINGS $715.00 SYSTEM SIZE 40kW GENERATION 53.96MWh YEARLY COST BEFORE SOLAR
Sixt Car Rental | Commercial Solar Installation
Sixt Car Rental reached out to Cyanergy to explore options for reducing energy costs and enhancing sustainability.
Healey Factory Project
KEY PROJECT INFORMATION CASE STUDY The Healey Factory Mitcham, VIC 3132 Download Case Study INVESTMENT $56,035.00 PAYBACK PERIOD 35 Months SYSTEM SIZE 59.4 kW GENERATION 77.621MWh YEARLY COST BEFORE SOLAR
Greenwood Business Park
Greenwood Business Park Working on big projects is not new to Cyanergy. We have had a handful of significant and relatively complicated jobs that we have successfully completed. One of