Aged Care Facility

KEY PROJECT INFORMATION

CASE STUDY

Age-Care Facility Project

Mitcham, VIC

Investment

INVESTMENT

$60,000.00

Payback period

PAYBACK PERIOD

52.8 months

Monthly savings

MONTHLY SAVINGS

$1,193.25

System size

SYSTEM SIZE:

60 kW

Generation

GENERATION

80.652 MWh

solar panel installation

Age Care Facility Project

Our customer sought a sustainable, high-quality, and affordable renewable energy solution that would help reduce operating costs. The Chief Operating Officer, was concerned about the potential impact on residents and maintaining service levels during such a complex rollout.  24-hours business operations, and health and safety and patient care obligations.

Cyanergy tailored the solar power systems to the roof spaces and electrical layouts of the Aged Care facility. In total, this comprised 132 solar panels covering a total area of 400 m2. Limiting disruption to daily operations over the two-stage rollout was managed in a flexible and cooperative manner. Our project management team maintained a high level of collaboration, communications, and policies and procedures were also modified to accommodate needs.

The 60 kW solar solutions have helped the Aged Care meet their goals for energy savings and sustainability. In total the systems are generating, on average, 210 kWh per day. 

Aged Care Facility

Contact us today to learn more about how commercial solar can work for your business

Recent Projects

commercial solar project

Healey Factory Project

KEY PROJECT INFORMATION CASE STUDY The Healey Factory Mitcham, VIC 3132 Download Case Study INVESTMENT $56,035.00 PAYBACK PERIOD 35 Months SYSTEM SIZE 59.4 kW GENERATION 77.621MWh YEARLY COST BEFORE SOLAR

Read More »

Greenwood Business Park

Greenwood Business Park Working on big projects is not new to Cyanergy. We have had a handful of significant and relatively complicated jobs that we have successfully completed. One of

Read More »

Ram Locksmith Project

KEY PROJECT INFORMATION CASE STUDY Ram Locksmith Dandenong, VIC Download Case Study INVESTMENT $31,820.00 PAYBACK PERIOD 39 Months MONTHLY SAVINGS $715.00 SYSTEM SIZE 40kW GENERATION 53.96MWh YEARLY COST BEFORE SOLAR

Read More »

Sparacino Farms | Commercial Solar Installation

Sparacino Farms reaching out to Cyanergy to explore options for reducing energy costs and enhancing sustainability. Cyanergy’s team conducted a thorough assessment of the farm’s energy needs and financial goals, offering a tailored solar solution that included a 99.76 kW system for the farm and a separate 27.7 kW system with battery storage for the residential property.

Read More »
commercial solar installer

Wyndham Community Schools

KEY PROJECT INFORMATION CASE STUDY Wyndham Community Schools Werribee, VIC Download Case Study INVESTMENT $49,000.00 PAYBACK PERIOD 49 Months SYSTEM SIZE 54.25 kW GENERATION 69.9MWh Wyndham Community Schools The ChallengeMost

Read More »

Retail

Retail Initially, the retail store was not properly lighted. They were facing problems with safety and productivity. Plus the high power bill and high maintenance cost. These challenges made them

Read More »
Scroll to Top