KEY PROJECT INFORMATION
INVESTMENT
$60,000.00
PAYBACK PERIOD
52.8 months
MONTHLY SAVINGS
$1,193.25
SYSTEM SIZE:
60 kW
GENERATION
80.652 MWh
Age Care Facility Project
Our customer sought a sustainable, high-quality, and affordable renewable energy solution that would help reduce operating costs. The Chief Operating Officer, was concerned about the potential impact on residents and maintaining service levels during such a complex rollout. 24-hours business operations, and health and safety and patient care obligations.
Cyanergy tailored the solar power systems to the roof spaces and electrical layouts of the Aged Care facility. In total, this comprised 132 solar panels covering a total area of 400 m2. Limiting disruption to daily operations over the two-stage rollout was managed in a flexible and cooperative manner. Our project management team maintained a high level of collaboration, communications, and policies and procedures were also modified to accommodate needs.
The 60 kW solar solutions have helped the Aged Care meet their goals for energy savings and sustainability. In total the systems are generating, on average, 210 kWh per day.
Contact us today to learn more about how commercial solar can work for your business
Recent Projects
New life Aquarium
KEY PROJECT INFORMATION CASE STUDY New life Aquarium Keysborough, VIC Download Case Study INVESTMENT $31,250.00 PAYBACK PERIOD 38 Months MONTHLY SAVINGS $743.33 SYSTEM SIZE 40.5 kW GENERATION 51MWh YEARLY COST
Ringwood North, Victoria
Vetland 24-Hour Animal Hospital in Mitcham, Victoria, Partners with Cyanergy for a Sustainable Future
Tixana Pty Ltd
KEY PROJECT INFORMATION CASE STUDY Tixana Pty Ltd Campsie, NSW Download Case Study INVESTMENT $44,920.00 PAYBACK PERIOD 38 Months MONTHLY SAVINGS $907.50 SYSTEM SIZE 40.33 kW GENERATION 51MWh YEARLY COST
Yea, Victoria
Vetland 24-Hour Animal Hospital in Mitcham, Victoria, Partners with Cyanergy for a Sustainable Future
Ram Locksmith Project
KEY PROJECT INFORMATION CASE STUDY Ram Locksmith Dandenong, VIC Download Case Study INVESTMENT $31,820.00 PAYBACK PERIOD 39 Months MONTHLY SAVINGS $715.00 SYSTEM SIZE 40kW GENERATION 53.96MWh YEARLY COST BEFORE SOLAR
Whites Glenola Hay Far | Commercial Solar Installation
Yearly energy cost before solar $8750.00. Yearly energy cost after solar $428.00