Aged Care Facility

KEY PROJECT INFORMATION

CASE STUDY

Age-Care Facility Project

Mitcham, VIC

Investment

INVESTMENT

$60,000.00

Payback period

PAYBACK PERIOD

52.8 months

Monthly savings

MONTHLY SAVINGS

$1,193.25

System size

SYSTEM SIZE:

60 kW

Generation

GENERATION

80.652 MWh

solar panel installation

Age Care Facility Project

Our customer sought a sustainable, high-quality, and affordable renewable energy solution that would help reduce operating costs. The Chief Operating Officer, was concerned about the potential impact on residents and maintaining service levels during such a complex rollout.  24-hours business operations, and health and safety and patient care obligations.

Cyanergy tailored the solar power systems to the roof spaces and electrical layouts of the Aged Care facility. In total, this comprised 132 solar panels covering a total area of 400 m2. Limiting disruption to daily operations over the two-stage rollout was managed in a flexible and cooperative manner. Our project management team maintained a high level of collaboration, communications, and policies and procedures were also modified to accommodate needs.

The 60 kW solar solutions have helped the Aged Care meet their goals for energy savings and sustainability. In total the systems are generating, on average, 210 kWh per day. 

Aged Care Facility

Contact us today to learn more about how commercial solar can work for your business

Recent Projects

Animal Health

Animal Health When the Animal Emergency Center moved their office to East Melbourne, they realized that the lighting I the premises was not up to the standard. They called us

Read More »

Lilydale Service Group

KEY PROJECT INFORMATION CASE STUDY Lilydale Service Group Lilydale, VIC Download Case Study INVESTMENT $33,651.96 PAYBACK PERIOD 32 Months MONTHLY SAVINGS $887.50 SYSTEM SIZE 38.15kW GENERATION 53.973MWh YEARLY COST BEFORE

Read More »

AC Laser | Commercial Solar Installation

A leading manufacturer based in Thomastown, Victoria, turned to Cyanergy to meet their solar energy needs. To reduce their escalating energy costs and increase sustainability, AC Laser invested $90,600 in a 99.45 kW solar system that generates 141.75 MWh annually.

Read More »

Manufacturing

Manufacturing To remain strong in industry, we scrutinize costs across every process. Lighting can account for up to 80% of a manufacturing warehouse energy bill so it must be as

Read More »

Sparacino Farms | Commercial Solar Installation

Sparacino Farms reaching out to Cyanergy to explore options for reducing energy costs and enhancing sustainability. Cyanergy’s team conducted a thorough assessment of the farm’s energy needs and financial goals, offering a tailored solar solution that included a 99.76 kW system for the farm and a separate 27.7 kW system with battery storage for the residential property.

Read More »