KEY PROJECT INFORMATION

CASE STUDY

Commercial Joinery Company

Dandenong, VIC

Investment

INVESTMENT

$75,000.00

Payback period

PAYBACK PERIOD

6 Years

Monthly savings

MONTHLY SAVINGS

$1017.67

System size

SYSTEM SIZE:

99.82 kW

Generation

GENERATION

127.75 MWh

YEARLY COST BEFORE SOLAR

$29,755.92
YEARLY COST BEFORE SOLAR 30%

YEARLY COST AFTER SOLAR

$14,700.20
YEARLY COST AFTER SOLAR 15%

Commercial Joinery Company

Commercial Joinery Company was established in 2006 and is a specialist industry leader delivering joinery services to commercial clients.

With power bills around 30k per year, Commercial Joinery Company asked Cyanergy to propose a suitable commercial solar solution.

Installing a commercial solar system for your business is a straightforward decision. As with all business investment decisions, it is all about the Return On Investment (ROI). When proposing a commercial solar system for a business, Cyanergy examines the current power usage patterns and designs a system that suits their requirements.

Using an advanced satellite-based solar mapping software, Cyanergy maps the solar panels onto the roof. The software takes into account the location, panel model, panel tilt and orientation to produce a report that gives the estimated output of the system allowing us to calculate estimated yearly savings and payback time.

OUTCOME SUMMARY

  • Reduction in cost of energy by almost half
  • Business is protected against future electricity rate increases
  • Increased value of the property
  • Reduced carbon emissions
  • Improved business cash flow
installation by a CEC approved installer

Contact us today to learn more about how commercial solar can work for your business

Recent Projects

Manufacturing

Manufacturing To remain strong in industry, we scrutinize costs across every process. Lighting can account for up to 80% of a manufacturing warehouse energy bill so it must be as

Read More »

Ashfield Bowling Club | Commercial Solar Installation

Ashfield Bowling Club has invested $9,670 in a 32.56 kW solar system, generating 41.395 MWh annually. This initiative saves $805.83 monthly, with a payback period of 12 months, showcasing the club's commitment to sustainability and energy efficiency for its members and the community.

Read More »

Ram Locksmith Project

KEY PROJECT INFORMATION CASE STUDY Ram Locksmith Dandenong, VIC Download Case Study INVESTMENT $31,820.00 PAYBACK PERIOD 39 Months MONTHLY SAVINGS $715.00 SYSTEM SIZE 40kW GENERATION 53.96MWh YEARLY COST BEFORE SOLAR

Read More »

Fuel Stations

Fuel Stations Bright and clear canopy lighting increases a sense of safety and the comfort that can make the difference between “let’s drive on to the next one” to “let’s

Read More »
School Case Study

School

School This LED upgrade for a primary school in McKinnon, Victoria is a well-thought decision. It was high time for the school to find a solution to their sky-high energy

Read More »

The Bean Cartel | Commercial Solar Installation

The Bean Cartel, a renowned coffee roasting company based in Notting Hill, Victoria, made a strategic investment in solar energy to enhance sustainability efforts and reduce operational costs. With the assistance of Cyanergy, The Bean Cartel successfully installed a solar array comprising 41 JASolar panels on the roof of their warehouse.

Read More »
Scroll to Top